My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
10/05/1983 PLANNING BOARD Minutes
>
10/05/1983 PLANNING BOARD Minutes
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/10/2023 5:06:54 PM
Creation date
1/10/2023 12:31:20 PM
Metadata
Fields
Template:
Mashpee_Meeting Documents
Board
PLANNING BOARD
Meeting Document Type
Minutes
Meeting Date
10/05/1983
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
4
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
PLANNING BOARD <br />Town of Mashpee <br />t'LAN INN BOARD �'�I�'1�. IES : October �, 1983 <br />MEMBERS PRESENT: Earle Maarsters, Michele � tone, Harold Collins, <br />Richardson Jonas <br />CONSULTING ENGINEER: 'har'l. e s T . Rowley <br />TIME,: 8 : 00 p.m. <br />Mrs, Peck came before the Board. requesting a release of covenant fay <br />her entire subdivision or at least lots 3 4. 'The Board stated the <br />work hadn't been completed on the. road and when it is . done, the <br />engineer would have to inspect it before they could release the <br />covenant. <br />Mr. Rowley stated they would have to clean the _ basins, set the bounds, <br />and he would have to see if the road extended 50' beyond lot. 4 for <br />adequate access. If it didn't , they would have to combine lots 2, 3 <br />& 4 into 2 lots. The Board said if Mrs. IL:'eck did have to combine there, <br />they wanted a plan show�.ng such. They told Mrs, Peck when the work <br />was done to cont-act Mr. Rowley and he would be able to make the <br />inspection within 2 days. The. Board would wait for his report before <br />releasing any lots, <br />Petitioner: Resorts Development Inc' . <br />�..IA1i oui V Ved by: Islands Islads Survey Co. <br />Type of Plan: preliminary <br />Location: Quinaqui s s et Ave. <br />Fee: t5O. OO <br />They had before presented an Approval Not Required for the lot s <br />fronting the street and this was for an additional. 21 lots in the <br />rear., All lots were at least 22, c'aD sq . ft. with 2100 linear feet of <br />ro adwair and a total of 13+ acres. <br />The Board .felt lot 11 would make a nice drainage spot but the definitive <br />plan will show , the actual drainage anyway. They asked Mr. Rowley to <br />look at it and submit a reDor t , but they felt it net the prel im:inary <br />plan r'ea ufiremen t s , <br />Mr. Rowley told IL hem to contact the Highwav Department and give them <br />a plan as they Tip ill eventually have to obtain an opening p ermiit . Ue <br />,aid he would do so and also give a copy to the Eoa�°d of wealth. <br />MnCrCath came bef are the Board represent i1xg P &H L -6i� Deer <br />Crossing with a landscapl.ng and site plan and definitive p-lan <br />1h warl v ewed the 1cl. "lus�a_ Ln_; _ � .?'�! .nd na teG� t �' .?'?�iSCc. � �� , ���cZ nit <br />sC � } r" }} "_ ll'•* �7 r, �+ t� t �, *"g �.-y i They ��j rs L�.'c they : i.'L 1 d b e 7a T ! 1 l :� � <br />h L% f} 7 J.� ram'. 1 L J .'. 4' Y �. v' t �. ! v A i t iJ a `r 1 1 +. + 1 L: A ,, (_,T <br />
The URL can be used to link to this page
Your browser does not support the video tag.