My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
06/15/1983 PLANNING BOARD Minutes
>
06/15/1983 PLANNING BOARD Minutes
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/10/2023 5:01:33 PM
Creation date
1/10/2023 12:39:55 PM
Metadata
Fields
Template:
Mashpee_Meeting Documents
Board
PLANNING BOARD
Meeting Document Type
Minutes
Meeting Date
06/15/1983
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
5
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
PLANNING BOARD <br /> Town of Mashpee <br /> PLANNING BOARD MINUTES: 6 15 o-8 3 Co nt'd. Page 3 <br /> they can't have them done now, but bef ore putting the roads in. He f elt right now <br /> they were dealing on a preliminary basis. Mr. Marster said they would also have to <br /> have drainage plans, calculations and road profiles before the roads go in, <br /> Mr. Blank added they have other phases of landscaping which would come in later. <br /> The Board took the plan under advisement, <br /> Petitioner: Stuart Bornstein <br /> Submitted by: Stuart Bornstein <br /> Type of Plan: Approval Not Required <br /> Vocation: Riverview Ave, <br /> Mr. Bornstein came before the Board with the same plan which he had come before the <br /> Board with on 6-1-83. Mr. Marst ears stepped down from the deliberations <br /> ,Mr. Terry said Charles Rowley was supposed to look at the road and submit a report <br /> ,And the Board hadn't received his report. It had been postponed before so that <br /> Mr. Bornstein could submit the Plans to Mr. Rowley,, Mr. Costa said Mr. Rowley hadn't <br /> told him anything� Mr. Terry said he felt the Board should wait for Mr. Rows.ey`s <br /> report., <br /> Mr. Bornstein stated he just wanted ANR releases and he' s only continuing the road <br /> 300 or 400' to serve 15 more units, <br /> The Board agreed to wait until they got a report from Mr. Rowley and told Mr. <br /> Bornstein they would place him on the agenda for July 6th, <br /> John China came before the Board representing VaCava Trust to request a covenant <br /> release for Phase II of -Quashnet Valley Condos. This .included 4 buildings. He <br /> said Mr. Rowley had been up to inspect the road. <br /> The Board didn't have a report from Mr. Rowley and it was pointed out that it could <br /> be due -to the fact that Mr, Umina was not on the agenda.. <br /> Mr. Umina said they were going to pass papers before the next meeting but Mr. Marsters <br /> said the Board couldn't release it without a report from Mr. Rowley, <br /> The Board agreed to sign the release, leave it with the secretary. If Mr. Rowley got <br /> :.n touch with the secretary saying the road was okay, she Gould release the form to <br /> Mir. Umina. <br />
The URL can be used to link to this page
Your browser does not support the video tag.