My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
01/11/2023 ZONING BOARD OF APPEALS Minutes
>
01/11/2023 ZONING BOARD OF APPEALS Minutes
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/2/2023 5:00:29 PM
Creation date
2/2/2023 1:21:41 PM
Metadata
Fields
Template:
Mashpee_Meeting Documents
Board
ZONING BOARD OF APPEALS
Meeting Document Type
Minutes
Meeting Date
01/11/2023
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
9
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
MASHPEE ZONING BOARD OF APPEALS <br /> MEETING MINUTES <br /> JANUARY 11,2023 <br /> 49 Clover Lane: Owners, Samuel and Cielo Ordonez request a Special Permit under §174-17.1 <br /> of the Zoning Bylaws to allow for a raze and replace of a pre-existing non-conforming single <br /> family dwelling on property located in an R-3 Zoning District, and Popponesset Overlay District, <br /> Map 117 Parcel 328, Mashpee, MA. <br /> Attorney Kevin Kirrane represented the homeowners for the proposed raze and replace project. <br /> Also present was Mark Flaherty, Engineer who prepared the site plans. As indicated in the written <br /> presentation,the lot is 6,500 sq.ft.with 100 ft. of frontage along Clover Lane,and 65 ft.of frontage <br /> along Bearse Road. <br /> There is currently a single family two bedroom residential structure on the lot consisting of 800 <br /> sq. ft. The building was constructed in the 1940's. The applicants seek to raze and replace the <br /> current structure with a new two and a half story three (3) bedroom structure around 1,100 sq. ft. <br /> There is a two foot overhang on the second floor which has been calculated into the lot coverage. <br /> The existing structure is non:conforming at 21.5 ft., and fails to meet the 25 ft. front yard <br /> requirement. It also fails to meet the 15 ft. southerly side yard requirement which is currently 10.6 <br /> ft. This entire lot is within the flood plain, and has 0 sq. ft., and is 100% lot coverage which is a <br /> non-conforming condition. The new structure will also be 100% lot coverage. <br /> The bylaw section 174-17.1 allows for alterations, changes, and expansions to pre-existing non- <br /> conforming conditions, structures and otherwise. In this particular case, the new structure that is <br /> being proposed improves some of the non-conforming conditions,and eliminates other conditions. <br /> The front yard setback will improve as shown on the chart that was provided in the written <br /> presentation; the existing is 21.5 ft. from Clover Lane and the proposed will be 23 ft. but is still <br /> non-conforming because it does not meet the 25 ft. setback from Clover Lane. The side yard <br /> setback on the southerly side is currently 10.5 ft., and will become conforming at 15 ft. to the <br /> current zoning requirement. The current building code requires a Letter of Map Amendment <br /> (LOMA) application of the flood plain for the new structure, which is a substantial improvement <br /> over the existing condition of the old structure. The lot coverage is non-conforming at 13%. <br /> Arguably, a structure could be built on as much of this lot within the parameters of the side yard, <br /> front yard and rear yard setbacks without any limitations except the limitation that the Zoning <br /> Board, and Conservation Commission may impose upon on this particular lot. The proposed lot <br /> coverage is 22.5%which is well under the 25%lot coverage in the Popponesset Overlay District. <br /> There will be a new denitrification septic system installed which is an improvement over the <br /> existing conditions. The Board will find that the proposed is not substantially more detrimental to <br /> the neighborhood than the existing condition and its impact on the neighborhood. The <br /> Conservation Commission and the Board of Health has already approved this project. <br /> Mr. Kirrane said that the conditions will be improved on this lot in spite of any minimal increase <br /> in lot coverage. <br /> 2 <br />
The URL can be used to link to this page
Your browser does not support the video tag.