My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
02/09/2023 SEWER COMMISSION Minutes
>
02/09/2023 SEWER COMMISSION Minutes
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/24/2023 5:00:23 PM
Creation date
2/24/2023 11:34:53 AM
Metadata
Fields
Template:
Mashpee_Meeting Documents
Board
SEWER COMMISSION
Meeting Document Type
Minutes
Meeting Date
02/09/2023
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
4
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
Other items not reasonably anticipated by the Chair: <br /> Mrs. Sprout expressed concern about stakes that are currently being placed in the ground. She asked if <br /> homeowners should get a second opinion as to the stake placement, taking into consideration the 10 foot <br /> easement between the water and electric. <br /> Mrs. Sprout also requested a copy of the notice that goes out to the homeowners once the state is placed. <br /> Mrs. Sprout inquired about the timeline once the stake is placed and the homeowner has to decide if it is in <br /> the correct place. Mr. Jack stated that once the stake appears, it is an indicator of where the Town's <br /> engineers, from a design perspective, are presuming it's the best location for it to go. If the homeowner <br /> doesn't act on it or assumes that that is okay, that is where the lateral will be installed from the main. Mr. <br /> Jack went on to state that approximately 2 weeks after the stake goes into the ground the contractor will be <br /> installing the lateral. <br /> Meredith Harris stated that she thinks it is important to get information out to the homeowner in a timely <br /> manner, so that they know what is expected of them. She suggested a media blitz. <br /> Phyllis Sprout asked, if once the mains have been laid but the laterals have not, is it too late for any changes? <br /> Mr. Jack respond, yes. Because, they put a fitting in the main where the lateral will be located. <br /> Next meeting: <br /> February 23, 2023 <br /> Mashpee Town Hall <br /> Waquoit Meeting Room <br /> 16 Great Neck Road North <br /> Mashpee, MA <br /> Mr. Towle made a motion to adjourn the meeting. <br /> Mr. Lyons seconded the motion. <br /> Motion was passed by unanimous consent <br /> Meeting adjourned at 3:05PM <br /> Respectfully Submitted, <br /> 2 <br /> Susan Donovan <br /> Board Secretary <br /> 3 <br />
The URL can be used to link to this page
Your browser does not support the video tag.