My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
09/20/2022 PLAN REVIEW COMMITTEE MINUTES Minutes
>
09/20/2022 PLAN REVIEW COMMITTEE MINUTES Minutes
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/13/2023 5:00:17 PM
Creation date
3/9/2023 1:22:15 PM
Metadata
Fields
Template:
Mashpee_Meeting Documents
Board
PLAN REVIEW COMMITTEE MINUTES
Meeting Document Type
Minutes
Meeting Date
09/20/2022
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
6
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
Town of Mashpee <br /> ins, , seta 16 Great Neck Road North. <br /> r� g Mashpee, MA 02649 <br /> �fi �Ydmuw���4. <br /> Minutes of Meeting of <br /> Mashpee Plan Review Committee <br /> Tuesday, September 20, 2022 <br /> Mashpee Town Hall Waquoit Meeting Room <br /> Plan Review Members Present: <br /> Mr. David Morris Building Commissioner <br /> Ms. Catherine Laurent, DPW Director <br /> Mr. Scott Carline, Police Chief <br /> Mr. Drew McManus, Conservation Agent <br /> Ms. Christine Willander, Assistant Health Agent <br /> Mr. Joseph Peltier, Deputy Fire Chief <br /> 9:10 am Project Address: 79 Echo Road <br /> Business name: Mac Davis Flooring <br /> Owner/Agent: Pamela M. Gangemi, Trustee <br /> Representative: Attorney, Christopher Kirrane <br /> Architect/Engineer: Cape & Islands Engineering <br /> Reguest:_Applicant proposes to construct a 9,920 sq. ft. metal building with <br /> contractor bays under §174-25 (G) 14 for a flooring business and §174-25 (G) <br /> (6); §174-25 (G) (9). <br /> Attorney Christopher Kirrane represented the applicant to construct a 9,920 sq. ft. metal <br /> building in the 1-1 and Light Industrial Overlay Districts. The lot is situated on 90,382 sq. ft. lot, <br /> with 290 ft. of frontage. The proposed use is three (3) contractor bays for storage of flooring <br /> materials. There is no manufacturing just a warehouse. There are two separate bays that may <br /> provide future use for other tenants, and will require a filing with the ZBA for a modification. <br /> There is a small component of office space in the proposed building. There is a proposed fire <br /> suppression system that will be installed. The proposed parking in front of the building will <br /> require relief from the ZBA, and the rear of building will have a loading area. There will be a <br /> filing with the Board of Health for the septic system. <br /> Catherine Laurent, DPW Director <br /> Ms. Laurent asked what is proposed for the gravel area, and if there will be outside storage of <br /> materials. She asked that the perimeter of the parking will have the Cape Cod Berm, and if the <br /> front area that is disturbed will be restored with plantings to eliminate the existing dirt along the <br /> road. <br /> i <br />
The URL can be used to link to this page
Your browser does not support the video tag.