My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
03/23/2023 SEWER COMMISSION Minutes
>
03/23/2023 SEWER COMMISSION Minutes
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/19/2023 1:46:38 PM
Creation date
4/19/2023 1:43:42 PM
Metadata
Fields
Template:
Mashpee_Meeting Documents
Board
SEWER COMMISSION
Meeting Document Type
Minutes
Meeting Date
03/23/2023
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
3
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br /> <br />MINUTES <br />MASHPEE BOARD OF SEWER COMMISSIONERS <br />THURSDAY MARCH 23, 2023, 2:00 p.m. <br />MASHPEE TOWN HALL <br />WAQUOIT MEETING ROOM <br />16 GREAT NECK ROAD NORTH <br />MASHPEE, MA 02649 <br />*In-person, televised meeting* <br /> <br />Present: Vice-Chair, Meredith Harris (via Zoom), Clerk, Catherine Castaneda, <br /> Interim Town Engineer, Ray Jack, Phyllis Sprout, Al Towle, Erin Copeland <br /> <br />Other attendees: Michaela Wyman-Columbo, Select Board <br /> Sandra Tripp, GHD <br /> <br /> Absent: Chair, Chad Smith <br /> Joe Lyons <br /> <br />2:00PM – Convene Meeting Co-Chair, Meredith Harris called the meeting to order at 2:00PM in open session <br />at Mashpee Town Hall, Waquoit Meeting Room. <br /> <br />PLEDGE OF ALLEGIANCE <br /> <br />MOMENT OF SILENCE <br /> <br />PUBLIC PARTICIPATION <br />None at this time. <br /> <br />APPOINTMENTS AND HEARINGS <br />Erin Copeland was welcomed to the Sewer Commission by the Commissioners in attendance. <br /> <br />MINUTES <br />Mr. Towle made a motion to accept the minutes of the March 9, 2023 Sewer Commission Meeting. <br />Catherine Castaneda seconded the motion. <br />Motion passed by unanimous consent. <br /> <br />OLD BUSINESS <br /> None at this time. <br /> <br />NEW BUSINESS <br />1. Monthly Sewer Project Construction Update with Ray Jack. <br /> <br />Mr. Jack gave his monthly Sewer Project Construction update presentation stating that his update will be <br />informational as well as educational. <br />He reported that the collection system north project is over a quarter complete, collection system south is 8% <br />complete. <br />1 <br /> <br /> <br />
The URL can be used to link to this page
Your browser does not support the video tag.