My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
01/25/2023 ZONING BOARD OF APPEALS Minutes
>
01/25/2023 ZONING BOARD OF APPEALS Minutes
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/16/2023 5:00:48 PM
Creation date
5/16/2023 10:12:09 AM
Metadata
Fields
Template:
Mashpee_Meeting Documents
Board
ZONING BOARD OF APPEALS
Meeting Document Type
Minutes
Meeting Date
01/25/2023
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
15
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
MEETING MINUTES <br /> MASHPEE ZONING BOARD OF APPEALS <br /> JANUARY 25,2023 <br /> Attorney Christopher Kirrane represented the homeowners for the raze and replace project. Also <br /> present was Greg Siroonian with RESCOM. Mr. Kirrane provided the Board his written <br /> presentation, and an existing and proposed site plan. The existing structure was built in 1968, and <br /> is not building code or flood zone compliant. It is also non-conforming in several aspects. The <br /> front yard setback is 33.6 ft. and the requirement is 40 ft. The westerly side yard is 13.8 ft. and the <br /> requirement is 15 ft. The easterly side yard is 11.8 ft. existing, and the requirement is 15 ft. The <br /> setback to wetlands of the nearest structure is 16 ft. and the requirement is 50 ft. The lot is entirely <br /> within Land Subject to Coastal Storm Flowage(LSCSF),therefore the structure is non-conforming <br /> and exceeds the maximum allowable lot coverage (100% existing) and fails to meet the setback to <br /> wetlands (0' existing). <br /> The proposal consists of a new two-story, four bedroom structure. The site has a denitrification <br /> system that allows up to four bedrooms which meets the Board of Health requirements. The front <br /> yard setback is increasing slightly from 33.6 ft. to 31 ft. However, the westerly side setback will <br /> be improving from 11.8 ft.to 14.2 ft. The easterly side yard setback will be eliminated and become <br /> conforming at 16.4 ft. The setback from the nearest wetland will be improve from 16 ft. to 18 ft. <br /> The overall footprint hardscape on the lot is actually decreasing by 400 sq. ft. by removing the <br /> concrete patio that does not count toward lot coverage for zoning purposes. <br /> Attorney Kirrane said that the structure will be building code, and flood zone compliant. The <br /> project was approved by the Conservation Commission in 2022. Pursuant to Section 174-17.1 the <br /> Board has to make three findings: 1) No new conformities being created, 2) there's sufficient <br /> parking onsite (there will be two parking spaces on the driveway), and 3)the Board must find that <br /> the proposed structure is not substantially more detrimental to the neighborhood than what <br /> currently exists. <br /> The Board had a discussion regarding the front setback shown on the proposed site plan that depicts <br /> 31 ft. to the proposed walkway, and the Board knows that a walkway is not included in lot <br /> coverage. The Board wanted to know the closest setback of the structure to the street on the <br /> proposed site plan. The Board thought that the existing building would be closer to the road than <br /> the proposed structure. The Board requested that the applicant provide a revised a site plan prior <br /> to a building permit that depicts pre-construction and post-construction setbacks and that there is <br /> no increase on that setback. <br /> Mr. Reidy read the Conservation Department comments into the record; The Conservation <br /> Commission approved this project with conditions of compensatory plantings (mitigation) in the <br /> areas of existing gardens abutting the coastal bank in exchange for the raze and replace of the <br /> single family home and the temporary impacts thereof to the lot. Additional condition that any <br /> restored lawn areas must meet current conservation-friendly lawn standards as per Regulation 31 <br /> under Mashpee's Ch.172 wetland bylaw. The Board of Health comments were read into the record; <br /> "BOH: The septic design plan has been approved for 4 bedrooms. The floor plans depict 4 <br /> bedrooms rooms that meet the BOH bedroom definition. The raze and replacement of the dwelling <br /> will also require a rodent inspection prior to approval of the demoibuilding permit." <br /> 3 <br />
The URL can be used to link to this page
Your browser does not support the video tag.