My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
05/01/2023 ANNUAL TOWN MEETING
>
05/01/2023 ANNUAL TOWN MEETING
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/25/2024 2:12:04 PM
Creation date
6/20/2023 2:53:52 PM
Metadata
Fields
Template:
Town Meeting Warrants
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
48
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
residential style fencing where necessary to screen the solar energy systems on a year round basis from <br />adjacent residences. <br />9. Land Clearing and Soil Erosion — Clearing of natural vegetation and topsoil shall be limited to what is <br />necessary for the construction, operation, and maintenance of the ground -mounted solar energy system. <br />No topsoil removed during construction shall be exported from the site. <br />10. Erosion Control and Stormwater — Erosion Control and Stormwater Management notation shall be <br />included to show that adequate provisions against erosion and adverse impacts of runoff are appropriately <br />mitigated. <br />11. Emergency Services — The ground -mounted solar energy system owner or operator shall provide a copy <br />of the project summary, electrical schematic, and site plan to the Mashpee Fire Department, and any other <br />neighboring Fire Department upon request. Upon request the owner or operator shall cooperate with local <br />emergency services in developing an emergency response plan. All means of shutting down the solar <br />energy system shall be clearly marked. The owner or operator shall identify a responsible person for public <br />inquiries throughout the life of the installation. <br />F. Waivers <br />The Planning Board may, upon the prior written request of the applicant, waive any of the requirements of <br />this Section, and shall state its reasons for doing so, in writing, as part of its decision. <br />Submitted by the Planning Board <br />Explanation: This article would expand solar energy system uses for medium scale (up to 40,000 square feet) <br />and large scale (greater than 40,000 square feet) into the C-1 and C-2 Commercial Zoning Districts. Any medium <br />and large-scale solar energy system proposed in either of those zoning districts would require an application to <br />the Planning Board for a special permit outlining compliance with the minimum required performance standards <br />of this article. This article requires a 2/3 vote. <br />The Select Board recommends approval of Article 32 by a vote of 5-0 <br />The Finance Committee recommends approval of Article 32 by a vote of 5-0 <br />The Planning Board recommends approval of Article 32 by a vote 3-1 <br />Motion made by Select Board Member Weeden <br />Motion: I move the Town vote to approve Article 32 as printed in the warrant. <br />Motion passes at 8:26 PM <br />
The URL can be used to link to this page
Your browser does not support the video tag.