Laserfiche WebLink
<br />Mr. Cook made a motion for a continuance which was seconded by Ms. Copeland. <br /> <br />Roll Call Vote: <br />Steve Cook (Yes) <br />Erin Copeland (Yes) <br />Sandra Godfrey (Yes) <br />Paul Colombo (Yes) <br />4 – 0 (unanimous) <br /> <br />6:21 Kenneth E. Marsters, II, 53 Lakeview Drive. Proposed construction of in-ground pool, AOOC <br /> <br />landscaping and hardscaping. Representative: Prime Properties Limited Partnership <br /> <br />(continued from 6/29). <br /> <br />The applicant went through the progress made on remedying the issues with the property. <br />The applicant noted he had worked with Mr. McManus to achieve some gains in the condition <br />of the wetlands impacted such as: replacement of the fencing, hay bales, and a placement <br />of a berm to deal with runoff. The applicant’s future plan involves planting to stabilize the <br />area. Mr. Colombo noted it was marked improvement based on his recent site visit. <br /> <br />August 10 @ 6:00 pm <br /> <br />Mr. Cook made a motion for a continuance which was seconded Ms. Copeland <br /> <br />Roll Call Vote: <br />Steve Cook (Yes) <br />Erin Copeland (Yes) <br />Sandra Godfrey (Yes) <br />Paul Colombo (Yes) <br />4 – 0 (unanimous) <br /> <br /> <br />6:15 Returning from Consultation with Owner and Reopening the Hearing: RDA <br />th <br /> <br />The applicant requested a continuance – August 10 @ 6:06 pm <br /> <br /> <br />Mr. Cook made a motion for a continuance with the conditions: To develop a site plan <br />showing the 100’ buffer, mitigation for two pitch pines to be removed, and to show all trees <br />to be removed, new grades, walls and erosion control which was seconded by Ms. Godfrey. <br /> <br />Roll Call Vote: <br />Steve Cook (Yes) <br />Erin Copeland (Yes) <br />Sandra Godfrey (Yes) <br />Paul Colombo (Yes) <br />4 – 0 (unanimous) <br /> <br /> <br />6:24 Thomas and Joan Marie Analetto, Trustees, 48 Quaker Run Road. Proposed NOI <br /> <br />construction of pier, ramp and float. Representative: Shorefront Consulting (continued from <br /> <br />6/29). Project was previously continued to receipt of stamped plans and Shellfish Constable <br />comments. <br /> <br />Mr. Cook noted the applicant had done everything the Commission had requested – stamped <br />plan with DEP number. Mr. Kent confirmed with the applicant that the Shellfish Constable <br /> <br />