Laserfiche WebLink
MASHPEE ZONING BOARD OF APPEALS <br /> MEETING MINUTES <br /> NOVEMBER 8, 2023 <br /> -The turning radius at the driveway entrances of the property be widened in consideration <br /> of the DPW Director's comments. <br /> -The design of the septic system be amended to consider additional employees if the <br /> proposal is increasing from six to eight bays. <br /> -The existing vacant portion of the site to the west of the parcel be seeded and loamed with <br /> 6 inches of material in accordance with Conservation seed mix recommendations. <br /> -A split rail fence be installed along the north and west parking area where it is developed. <br /> -The building will have a sprinkler system installed. <br /> -The plans be amended to adequately show the number of contractor bays. <br /> There were no more comments from the Board or audience. <br /> Mr. Blaisdell made a motion to close public comments. Mr. Furbush second. All were in favor to <br /> close public comments. <br /> Mr. Reidy made a motion that the Board issue a Special Permit to Owner, Chapter Closed LLC <br /> under §174-25; §174-25 (G) (14); §174-24 (C) (2); §174-45.6; §174-37, and §174-41 (M) of the <br /> Zoning Bylaws to allow for construction of 9,672 sq. ft. contractor bay warehouse metal building <br /> on property located in the I-1 and Light Industrial Overlay District,Map 19,Parcel 10-5,Mashpee, <br /> MA with the following conditions: <br /> 1. The Board has determined that the applicant meets all the conditions of a Special Permit <br /> under Mass General Law 40A Section 9. <br /> 2. Proposed Site Development Plan,Prepared for:Nicholas A. Pastore,Project: 50 Evergreen <br /> Circle. Mashpee, MA, date: August 30, 2023. Sheet 1: Cover Sheet, Sheet 2: Existing <br /> Conditions, Sheet 3: Layout and Landscape Plan, Sheet 4: Grading & Utility Plan, Sheet <br /> 5: Septic Plan, Sheet 6: Photometric Plan, Sheet 7: Construction Details. Rev. Date: <br /> 10/10/23: Revisions Per Site Plan and Design Review. Stamped and signed by: Mark D. <br /> Dibb, Professional Engineering, No.: 45937. O&M Plan Dated: October 24, 2023 signed <br /> by Applicant. Storm Water Management Report and Design Calculations, Dated: August <br /> 29, 2023, Rev 1: October 10, 2023. Rev.: 10/24/23: Misc. Revisions Per 10/21/23 Peer <br /> Review. 11/02/23: Coordinate Tree Size Notes. <br /> 3. Floor Plan—Project Name: Pastore Excavation, 50 Evergreen Circle,Mashpee,MA. Date: <br /> 5/12/23, Scale:' 1/8" = 1', Prepared by: Priggen Steel, Wrentham, MA. Stamped by: <br /> Theodore C. Greenlaw Professional Engineer No. 29093. S-1: Floor Plan, S-2: Elevation, <br /> S-3: Foundation, S-4: Details, S-5: Roof Framing, S-6: Cross Section. <br /> 7 <br />