My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
04/26/2023 ZONING BOARD OF APPEALS Decision
>
04/26/2023 ZONING BOARD OF APPEALS Decision
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/19/2023 5:03:21 PM
Creation date
12/19/2023 3:28:41 PM
Metadata
Fields
Template:
Mashpee_Meeting Documents
Board
ZONING BOARD OF APPEALS
Meeting Document Type
Decision
Meeting Date
04/26/2023
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
41
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
MASHPEE ZONING BOARD OF APPEALS <br /> DECISION FOR A VARIANCE <br /> Petitioner, Pastore Excavation, Inc. <br /> Owner, Chapter Closed, LLC <br /> 40 Evergreen Circle, (Map 19 Parcel 10-4) <br /> Mashpee, MA 02649 <br /> V-2023-29 <br /> Mr. Goldstein wanted to confirm the total amount of contractor bays in the building. Attorney <br /> Kirrane said; it's a four bay building and the plan indicated that each bay had a bathroom. The <br /> owner will occupy two of the bays. <br /> In view of the foregoing,the Board determined the Petitioner met the criteria for a Variance. Upon <br /> motion duly made and seconded at the Public Hearings on Wednesday, May 10, 2023 the Zoning <br /> Board of Appeals voted unanimously to issue Petitioner,Pastore Excavation, Inc. a Variance from <br /> the front yard setback under §174-31 (Land Space Requirements) of the Zoning Bylaws to allow <br /> for construction of a metal commercial building with contractor bays on property located in the I- <br /> 1 and Light Industrial Overlay District(s), Map 19, Parcel 10-4, Mashpee,MA. (Owner of record: <br /> Chapter Closed, LLC)with the following conditions: <br /> 1. The Board has determined that the applicant meets all the conditions of a Variance under <br /> Mass General Law 40A Section 10. <br /> 2. Proposed Site Development Plan,Prepared for: Nicholas A.Pastore,Project:40 Evergreen <br /> Cir. Mashpee, MA, date: March 10, 2023. Page 1: Cover Sheet, Page 2: Existing <br /> Conditions,Page 3: Layout Plan,Page 4: Grading&Utility Plan,Page 5: Septic Plan,Page <br /> 6: Construction Details. Prepared by Cape & Island Engineering. Stamped and signed by <br /> Mark Dibb, No: 45937. Revised Page 1 of 6: Date: 4/25/23: Move 4 Spaces, Add <br /> Landscaping, Revised Page 5 of 6: Date: 4/28/23: Add Test Pit Data. O&M Plan Dated: <br /> April 28, 2023 and signed by applicant. <br /> 3. Floor Plan—Project Name: Pastore Excavation, 40 Evergreen Circle,Mashpee,MA. Date: <br /> 1/25/23, Scale: 3/16" = 1', Prepared by: Priggen Steel, Wrentham, MA. Stamped by: <br /> Theodore C. Greenlaw Professional Engineer No. 29093. S 1 thru S-6. Revised S-2: <br /> Depicting Shutters Added On Windows. <br /> 4. The Board determined that the lot is odd shaped and situated on a corner of a round-about <br /> thereby issues a Variance in the amount of one (1) ft. <br /> 4 <br />
The URL can be used to link to this page
Your browser does not support the video tag.