Laserfiche WebLink
MASHPEE ZONING BOARD OF APPEALS <br /> MEETING MINUTES <br /> JANUARY 10,2024 <br /> Mr. Bonvie asked for a motion to close the public hearing. Mr. Blaisdell, so moved. Mr. <br /> Ganzenmuller, second.Mr. Bonvie asked if there were any more comments from the Board. There <br /> were no more comments. Mr. Bonvie asked for a motion to approve the petition. Mr. Blaisdell, so <br /> moved, Mr. Ganzenmuller, second. <br /> Mr. Reidy made a motion that the Board approve the Written Finding for 31 Birch Way with the <br /> following conditions: <br /> 1. The Board has determined that the applicant meets all the conditions of a Written Finding <br /> under Mass General Law 40A Section 6. <br /> 2. Site Plan—Existing and Proposed Conditions, 31 Birch Way, Mashpee,MA. Prepared for: <br /> Gary & Denise Nagle, Scale: 1" =20', Drawn by: PTM, Date 10/13/23, Sheet 2 of 2. <br /> Prepared by: Engineering Works, Inc. and RAS Associates, Stamped and signed by: Peter <br /> McEntee, Civil No.: 35109 and Stephen Cartwright,No.: 37041. Revision Date: 12/15/23: <br /> 1) Show upland and wetland areas. 2) Recalculate Lot Coverage, 3)Add Roof Drains. <br /> 3. Building Plans — 31 Birch Way, Prepared by: JB Designs, Pages 1-7, Date: 10/7/23. <br /> Revised Page 4 of 7: Proposed Second Floor Plan, Date Received: 11/28/2023. <br /> 4. Conditioned on all Town Department comments read into the record including but not <br /> limited to the Conservation Department and Board of Health. <br /> 5. Conditioned on the comments submitted by Catherine Laurent, DPW Director dated <br /> November 29, 2023. "Birch Way is a Town road. While no modifications to the existing <br /> paved driveway are proposed, currently storm water runoff from the property flows to the <br /> road. At a minimum, I request that any approval be conditioned upon installation of <br /> gutters, downspouts, and drywells on the new garage and porch to address the roof <br /> runoff. " <br /> 6. Any changes to the plans will require the applicant to return to this Board. <br /> 7. Conditioned upon a review by the petitioner's engineer that the existing plan be updated to <br /> show and confirm that the 16.7% existing lot coverage of 3,065 sq. ft., and that the <br /> proposed is 17.8%, proposed lot coverage is 3,195 sq. ft. Confirmation of those figures to <br /> be given in writing to the Building Commissioner prior to issuance of a building permit, <br /> and if there is any discrepancy on what is submitted and what is to be built, a new plan will <br /> be submitted to the Building Commissioner and the Zoning Board of Appeals. <br /> 8. The Board finds that the proposed project is not substantially more detrimental than the <br /> pre-existing, nonconforming structure or use to either the Town or the neighborhood. <br /> Mr. Furbush seconded. All were in favor. <br /> 3 <br />