My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
01/27/2024 BOARD OF HEALTH Minutes
>
01/27/2024 BOARD OF HEALTH Minutes
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/30/2024 5:00:47 PM
Creation date
1/30/2024 8:34:33 AM
Metadata
Fields
Template:
Mashpee_Meeting Documents
Board
BOARD OF HEALTH
Meeting Document Type
Minutes
Meeting Date
01/27/2024
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
10
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
CHAIR BAUMGAERTEL : If this did proceed, in order to any of that field testing,they would have <br /> to put some sort of? on the leaching field to do sampling of any kind. <br /> Mr. Harrington: I was thinking where you're doingthat 50%capture underneath,it put a sampling <br /> port on the return gravity line back to the septic tank and use that as your testing point. You can <br /> tell with whatever you're capturing at least to the point where it gets to the bottom of the filter <br /> if you put the sampling port close up to the leach field. It think that's an easy spot to sample to <br /> sample because that's a gravity flow you just put your cup down here and grab some flow back. <br /> CHAIR BAUMGAERTEL : Yea, do like a debox <br /> Mr. Harrington: Yea, debox, perfect. <br /> CHAIR BAUMGAERTEL: If we were requiring it, I would say I like the design and I've worked hard <br /> on the design, but I'd say no way. If DEP is saying you tentatively agree that we'll let you have 60 <br /> days to mediate this rather than take it farther. Maybe we just take what we can get out of it. <br /> Mr. Harrington:That would be my recommendation. <br /> CHAIR BAUMGAERTEL : Otherwise it's just going to be basically a standard system. It's better <br /> than a standard system, but it's not the design I would push forward. From scientific curiosity I <br /> would like to see how it performs in this type of scenario. We don't have this with chambers <br /> and under driveway would be new,this type of flow would be different. <br /> Ms. Patel: Would they add on to this area on to any of the phases for the sewer system now that <br /> they're getting approvals for funding. <br /> Mr. Harrington: it doesn't sound that way. <br /> CHAIR BAUMGAERTEL : They're telling us to put I/A systems in 3, 4 and 5 at this point. Which is <br /> probably a separate discussion. Funny thing is that it's going to come right down to 130, so it <br /> would take that much to run it this way. Maybe in 20 years they can tap off of that line and <br /> come down this way and take that system off. The other interesting thing to me is that this was <br /> included in Phase 1 and DEP isn't just going to say OK, well, you're fine now. They're still going <br /> get nitrogen removal from somewhere in the watershed. I asked Mike the question: Phase 1 <br /> said we're goingto capture this area and DEP said yes,we're going to meet our nitrogen removal. <br /> And then they said it's not going to work out with the tribe so we're not going to do this section <br /> of Phase 1 now. Where are they going to get that equivalent removal from? That is the question <br /> I have asked and have not gotten an answer to. Are they going to add something else on <br /> somewhere else? Is that the idea? <br /> Mr. Harrington: I think it was the selectmen who made the change because they're the ones who <br /> altered the phases to address the pond. It doesn't answer your question, but I think that's why <br /> the phases got changed. In order to address that area of Phase 1, 1 have no idea how they're <br /> going to address that, for those areas on Phase 1. <br />
The URL can be used to link to this page
Your browser does not support the video tag.