Laserfiche WebLink
Board of Managers <br />Upper Cape Regional Transfer Station <br />Meeting Minutes <br />October 18, 2022 <br />Mashpee Town Hall <br />Mashpee: <br />Catherine Laurent, Chairman <br />Falmouth: <br />Ray Jack, Peter McConarty (alt.) <br />Sandwich: <br />Paul Tilton <br />Bourne: <br />Dan Barrett, Phil Goddard (alt.) <br />Present: Chairman Catherine Laurent, Ray Jack, Peter McConarty, Paul Tilton, Dan Barrett <br />(remotely), Phil Goddard (remotely) <br />Also Present: Steven Tupper, Patty Daley — Cape Cod Commission; Carl Cavossa, Gregg Crowley, <br />Nina Vasques - Cavossa Disposal; Peter Flood — Green Seal Environmental; Tim Lydon — Bourne <br />DPW (remotely) <br />CALL TO ORDER <br />The meeting was called to order at 1:30 pm. <br />NEW BUSINESS <br />Discussion on Final Reports from Tetra Tech and Geosyntec/Next Steps <br />Patty Daley reviewed the findings of the two studies undertaken by the Cape Cod Commission <br />with its consultants — one looking at out-of-state MSW disposal, the other considering options <br />for diverting materials from the waste stream. Over 30% of the waste stream is food waste so <br />diverting this material would result in significant savings. Out-of-state disposal could be cost <br />effective particularly if rail utilized and there are MSW disposal options for facilities with more <br />than 10 years of projected capacity. Both diversion and rail, individually and combined, would <br />also reduce greenhouse gases. The next steps are targeted conversations with towns to gauge <br />interest in continuing participation and determine when existing MSW disposal contracts expire <br />in each town. <br />Discussion on Bourne Rail Trail/UCRTS Spur <br />Steve Tupper recapped the history of the Bourne Rail Trail. Study in 2017 looked at potential to <br />connect the Shining Sea Bikeway to the Canal trails both rail -to -trail and rail -with -trail. The <br />study area was divided into four phases. Phase 1 is from the canal to Monument Road. Design <br />is funded and is included on the TIP for construction in FFY25. The design is rail -with -trail. <br />Phase 4 is from the Shining Sea Bikeway into Bourne. This design is also funded and is rail -with - <br />trail. The Friends of the Bourne Rail Trail want to consider alternatives for the rail, specifically a <br />spur to the Bourne ISWM facility, so existing rail corridor would not have to be shared. There <br />are complications in Phase 4 with crossings of the rail and compliance with NSTB requirements. <br />The Commission had considered a rail spur to ISWM in 2017 but it was deemed too costly <br />because of the topography. But with replacement of the Bourne Bridge, there is an opportunity <br />to include a rail spur in that design. <br />