My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
12/08/2022 CONSERVATION COMMISSION Minutes (2)
>
12/08/2022 CONSERVATION COMMISSION Minutes (2)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/5/2024 5:01:23 PM
Creation date
3/5/2024 4:47:34 PM
Metadata
Fields
Template:
Mashpee_Meeting Documents
Board
CONSERVATION COMMISSION
Meeting Document Type
Minutes
Meeting Date
12/08/2022
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
8
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
Town of Mashpee <br />16 Great Neck Rd North <br />Mashpee, MA 02649 <br />Mashpee Conservation Commission Minutes <br />Thursday, December 8th, 2022 <br />Waquoit Meeting Room, Mashpee Town Hall, 16 Great Neck Road North <br />608-639-1400, extension 8564 <br />Broadcast Live on Local Cable Channel 18 <br />Streamed live on the Town of Mashpee website: hiips://www.mashpeema.gov/channel-18 <br />PRESENT: Paul Colombo, Brian Weeden, Alex Zollo, Charles Dalton, Marjorie Clapprood, <br />Erin Copeland, <br />CALL MEETING TO ORDER: Chairman Colombo called the meeting to order at 6:OOpm. <br />Pledge of Allegiance <br />PRE/POST-HEARING AGENDA: <br />Redbrook Rd Culvert Replacement Update: Neal Price of Horsley Witten Group <br />presented the background and details of a feasibility study conducted for a proposed <br />replacement of a failed culvert at Redbrook Rd. The culvert lies at the town boundary <br />with Falmouth and both towns are working cooperatively to deal with a replacement <br />strategy. Mr. Price detailed the history of assessment of the Redbrook system and culvert <br />details of the feasibility study for culvert replacement. Pare Engineering conducted a <br />phase 1 inspection of this dam back in 2019 and deemed it to be in failure status. Some <br />abutting residents attended this presentation and had some questions about the road, <br />culvert replacement and any additional restoration initiatives in this area <br />• Approval of Meeting Minutes <br />04-14-22: Chad Smith motion to approve minutes. Motion seconded by Brian <br />Weeden (voting: Chad, Paul, Charlie, Alex and Brian -unanimous) <br />04-28-22: Charlie Dalton motioned to approve minutes. Chad Smith seconded the <br />motion (voting: Chad, Paul, Charlie, Alex, Tom & Brian) <br />05-12-22: Charlie Dalton motioned to approve minutes, Chad Smith seconded the <br />motion (voting: Chad, Tom, Paul & Charlie) <br />05-26-22: Chad Smith motioned to approve minutes. Charlie Dalton seconded the <br />motion (voting: Chad, Paul, Tom, Alex & Charlie) <br />Updates: <br />o Redbrook Rd Culvert: Final report completed by Horsley Witten Group. <br />Recommendation for open box culvert with no flow restrictions. Consultant does <br />not recommend replacement of sandbags due to road safety concerns. Mr. <br />Colombo asked if the failed tidal dam downstream is part of the project scope <br />and the Agent clarified that it is not currently part of the project. <br />o Upper Quashnet Restoration: Phase 2 ongoing. No new updates <br />
The URL can be used to link to this page
Your browser does not support the video tag.