Laserfiche WebLink
o Johns Pond/Santuit Pond Milfoil: Surveying completed on both ponds. <br />Additional 3 acres to be treated on Johns Pond. Treatment forthcoming for the <br />3 acres on Johns Pond. Meeting with DNR and contractor to discuss approach <br />to Santuit Pond infestation <br />o Chopchaque Bog Restoration: Phase 2 planning and permitting ongoing <br />o Local Comprehensive Plan: Mr. Colombo detailed the public meeting on <br />closed systems <br />o Bylaw Review Subcommittee: Agent updated commission on the proposed <br />articles for the fall town meeting as recommended by the MVP consulting firm <br />of Fuss & O'Neill, including expansion of buffer zone from 100 to 150 ft, <br />restrictions on development within the 100 year floodplain and changes to tree <br />planting mitigation under Reg. 29 (Buffer Zones/Buffer Strips) <br />o CPA funding for 751 Main St: Agent requested a discussion on adding 751 <br />Main St acquisition to the October TM warrant. Discussion ensued. Mrs Zollo <br />asked what the purchase cost of the 8 acres is, which is roughly 1.2 million. <br />Agent suggested adding land acquisition as an ongoing agenda item. Mr <br />Weeden suggested the formation of a land acquisition subcommittee. Mr. Smith <br />endorsed this <br />HEARINGS: <br />6:00 Lawrence M. & Heidi E. Raffone, 10 Triton Way: Proposed addition to single family RDA <br />home. Representative: Holmes and McGrath, <br />Applicant has requested a continuance to January 121" at 6:09 p.m. <br />Mr. Weeden motioned to approve continuance request <br />Mrs. Zollo seconded the motion. <br />Vote: 6-0-0 <br />Roll Call Vote: <br />Mr. Weeden: yes <br />Mrs Clapprood: yes <br />Mr. Colombo: yes <br />Mrs Zollo: yes <br />Mr Dalton: yes <br />Mr. Colombo: yes <br />In favor,6; Opposed, 0; Abstentions, 0 <br />6:03 Steven & Jill M. Purpura, 134 Shore Drive West: Proposed construction and NOI <br />maintenance of beach access stairs down a coastal bank leading to coastal beach. <br />Representative, Cape and Islands Engineering. Raul Lizardi described the proposal and <br />situation that required the previous continuance, that being a violation that resulted in <br />topping of trees and illegal cutting of vegetation within 50 feet of the top of coastal bank. <br />Additionally, there was significant bank erosion observed by staff that requires stabilization. <br />New homeowner has taken responsibility for compliance of violations. Much of the cut <br />vegetation is invasive species, thus part of this application involves invasive species <br />management, bank stabilization and construction of beach access stairway. Mr. Lizardi <br />described the bank stabilization approach and methodology as well as the methodology for <br />the stairway construction. Mrs Copeland asked about timeline of cutting and who actually <br />did the cutting. Mr. Lizardi said it was a hired contractor and they're still trying to find out <br />who it was, but the contractor was hired by the previous homeowner. The violation took <br />place during the transition period of previous and current homeowner. Mrs Zollo asked <br />about presence of a view corridor. Agent recommends that a view corridor must be <br />