Laserfiche WebLink
Vote: 6-0-0 <br />Roll Call Vote: <br />Mr. Weeden: yes <br />Mrs Clapprood: yes <br />Mr. Colombo: yes <br />Mrs Zollo: yes <br />Mr Dalton: yes <br />Mr. Colombo: yes <br />In favor,6; Opposed, 0; Abstentions, 0 <br />6:12 Wayne P. Pacheco and Leanne J. Fitzgerald, 2 Sunset Circle Representative: Cape NOI <br />and Islands Engineering. Proposed addition to existing garage, expansion of existing deck <br />and landscaping. Raul Lizardi described the project and stated a previous approval was <br />provided but the work never took place and the permit expired. No increase in flow. Roof <br />runoff to be tied into drywells. Mitigation ratio of over 1:1 (648 sq feet of mitigation). Mrs <br />Clapprood questioned use of property/interior. Commissioner question about location of <br />mitigation area 2 and why it could not be closer to the pond edge. Consultant explained <br />rationale for mitigation where it is proposed along top of inland bank. <br />Mr. Weeden motioned to Close & Issue with condition of mitigation monitoring and <br />maintenance contract for two years. <br />Mrs Zollo seconded the motion. Agent requested amendment to motion to <br />reconfigure all mitigation plantings to run parallel to the shore line. <br />Vote: 6-0-0 <br />Roll Call Vote: <br />Mr. Weeden: yes <br />Mrs Clapprood: yes <br />Mr. Colombo: yes <br />Mrs Zollo: yes <br />Mr Dalton: yes <br />Mr. Colombo: yes <br />In favor,6; Opposed, 0; Abstentions, 0 <br />6:15 Karen Keelan, 4 Keelan Way, Representative: Wettech Design. Proposed hardscaping RDA <br />and landscaping. Mr. Wayne Tavares (attending remotely via zoom) described the <br />proposal details. Reconfiguration of existing landscaping and hardscaping entirely within <br />