My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
01/26/2022 ZONING BOARD OF APPEALS Minutes (2)
>
01/26/2022 ZONING BOARD OF APPEALS Minutes (2)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/22/2024 5:01:25 PM
Creation date
3/22/2024 12:02:03 PM
Metadata
Fields
Template:
Mashpee_Meeting Documents
Board
ZONING BOARD OF APPEALS
Meeting Document Type
Minutes
Meeting Date
01/26/2022
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
5
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
MASHPEE ZONING BOARD OF APPEALS <br /> MEETING MINUTES <br /> JANUARY 26,2022 <br /> Mr. Bonvie made a motion that the Board approve the Attorney's request for extension <br /> until February 9, 2022 on behalf of his clients at 18 Wilsons Grove for their Variance and <br /> raze and replace petitions. Mr. Goldstein seconded, yes, Mr. Bonnie, yes, Mr. Blaisdell, <br /> yes, Mr. Gould, yes, and Mr. Furbush, yes. All were in favor to accept the continuance. <br /> Mr. Senville,an abutter located at 20 Wilsons Grove asked the Board if he could attend the <br /> meeting via Zoom. Mr. Furbush said he could call in or write an email letter to the Board, <br /> and that email could be read into the record. Mr. Senville wanted to have a discussion with <br /> the Beard. <br /> OTHER BUSINESS <br /> Approve January 12,2022 Meeting Minutes. <br /> Sharon moved to approve the meeting minutes dated January 12, 2022. Mr. Gould <br /> seconded. All were in favor. <br /> ADDITIONAL TOPICS <br /> (This space is reserved for topics that the Chairman did not reasonably anticipate would be <br /> discussed.) <br /> Chris Gallagher, Town Engineer had sent the Board an email suggesting changes to <br /> wetlands bylaws to be submitted for the Town Meeting and Warrant. He invited Attorney <br /> Kirrane to be present during this discussion. Mr. Gallagher said there is a pending case <br /> regarding an issue with the setbacks and lot coverage within a flood plain. The 50 ft. <br /> setback bylaw is currently written referring to wetlands under M.G.L. Chapter 131 Section <br /> 40 and has to be adhered to. At the last hearing, there was an application regarding the 50 <br /> ft. setback for the tap of the coastal bank for a pool which would be included in the flood <br /> plain and cannot be setback 50 ft. because the whole lot is in the flood plain. In reading the <br /> terms of what defines a wetland, a coastal wetland, etc. includes land subject to flooding, <br /> so the entire Popponesset Neighborhood is land subject to the flooding. <br /> Mr.Bonvie asked if it included lot coverage. Mr. Bonnie mentioned that the Board tried to <br /> amend the 50 ft. setback bylaw a few years ago, that if Conservation approved an <br /> application it would not require Zoning. Mr. Gallagher said that anything written on <br /> setbacks stated in M.G.L. Chapter 131, Section 40 is considered a wetland even if high and <br /> dry. Mr. Gallagher said if there's an application that is in the flood plain and has to be 50 <br /> ft. from the wetland, they cannot be 50 ft. because they're in a flood plain. <br /> Mr. Kirrane said that more critical to that comment is the issue regarding lot coverage. If <br /> someone owns a vacant lot in Popponesset, or even a buildable lot that's in the flood plain, <br /> you are entitled to zero lot coverage as written in the bylaw. Mr. Bonnie questioned if it <br /> says you cannot count flood plain. Mr. Kirrane said it states water or wetlands as defined <br /> under the wetland protection act MGL C. 131 Section 40 cannot be counted for <br /> determination as to what constitutes lot coverage. <br /> 2 <br />
The URL can be used to link to this page
Your browser does not support the video tag.