My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
09/13/2023 ZONING BOARD OF APPEALS Minutes
>
09/13/2023 ZONING BOARD OF APPEALS Minutes
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/12/2024 5:04:43 PM
Creation date
4/12/2024 3:19:30 PM
Metadata
Fields
Template:
Mashpee_Meeting Documents
Board
ZONING BOARD OF APPEALS
Meeting Document Type
Minutes
Meeting Date
09/13/2023
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
10
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
SEPTEMBER 13,2023 <br /> MASHPEE ZONING BOARD OF APPEALS <br /> MEETING MINUTES <br /> The lot coverage of the proposed additions will increase to 19.82% but is still less than the <br /> maximum allowed 20%requirement. The reason the garage and the addition are before the Board <br /> is that the projects are within the 50 ft. to the wetlands resource areas. <br /> There are no other setback non-conformities.The garage is not within Conservation's jurisdiction. <br /> Mr. Reidy read the Conservation Department comments dated September 7, 2023 into the record; <br /> "Notice of intent permit application for additions to existing house, drywell installation, septic <br /> alternation, and mitigation plants approved at the August IOth hearing. Garage construction was <br /> out of Conservation jurisdiction. "Board of Health comments dated September 7, 2023 were read <br /> into the record. "In reference to the grinder pump in the garage be advised of the Title 5 <br /> regulations on "grinder pumps" (310 CMR 15.229: Pumping to Septic Tanks) and submit plans <br /> to health department for sewer line permit. Space above garage is unfinished and is not fit for <br /> human habitation, if it becomes finished it will be considered an increase inflow and would require <br /> and upgrade of the leach ingfield. " <br /> Attorney Kirrane did not have any issues with the conditions for the garage. <br /> Chairman Bonvie asked Mr. Dibb if the site plan depicted the roof drainage system was designed <br /> with a roof overflow for a 25-year event. Mr. Dibb said; yes, it is the same as the last application. <br /> Mr. Bonvie mentioned to Mr. Dibb that he had a discussion with Mr. Pesce, Consulting Engineer <br /> who provides peer review for the Board, and that the design criteria may change for future <br /> applications. Mr. Bonvie has concerns that future storms may cause drainage issues with certain <br /> properties. <br /> Chairman Bonvie asked for a motion to close the public comments. Mr. Reidy, so moved. Mr. <br /> Blaisdell second. All were in favor to close the public comments. There was no more discussion. <br /> Mr. Reidy made a motion that the Board issue a Written Finding to Owners, James C. Atkins and <br /> John J. Weltman under §174-17 and §174-33 of the Zoning Bylaws to allow for construction of a <br /> garage, and additions, alterations on property located in an R-3 Zoning District, Map 100 Parcel <br /> 4, Mashpee,MA with the following conditions: <br /> 1. The Board has determined that the applicant meets all the conditions of a Written Finding <br /> under Mass General Law 40A Section 6. <br /> 2. Site Plan — Prepared for: James C. Atkins & John J. Weltman, 80 Punkhorn Point Rd., <br /> Mashpee, MA. Sheet No.: 1 of 1, Date: July 7, 2023, Drawn by: MPR, Checked by: MC, <br /> Prepared by: Cape & Islands Engineering, Drawing Title: Proposed Addition Plan (No <br /> increase in flow), Stamped and signed by: Mark D. Dibb, No.: 45937, Registered <br /> Professional Engineer, and Matthew C. Costa,No.: 52282, Professional Land Surveyor. <br /> 4 <br />
The URL can be used to link to this page
Your browser does not support the video tag.