Laserfiche WebLink
MASHPEE ZONING BOARD OF APPEALS <br /> DECISION FOR A SPECIAL PERMIT <br /> Owner, Brendon P. Giblin <br /> 90 Popponesset Island Road, Map 106, Parcel 34 <br /> Mashpee, MA 02649 <br /> SP-2023-67 <br /> SPECIAL PERMIT CRITERIA <br /> ARTICLE V -Nonconforming Buildings and Uses <br /> §174-17.1 Raze and Replace History:Added 10-15-2018 ATM,Article 16,approved by Attorney <br /> General 1-9-2019. <br /> No pre-existing, non-conforming single or two (2) family dwelling structures shall be torn down <br /> and rebuilt on any lot unless there is an issuance of a Special Permit from the Zoning Board of <br /> Appeals. Such a Special Permit may be granted only if the Zoning Board of Appeals finds that <br /> any changes, extensions, alterations or reconstruction of the pre-existing non-conformities are <br /> not substantially more detrimental than exists prior to removal of the existing structure and that <br /> there is adequate land area to provide sufficient parking. In no case shall new non-conformities <br /> be permitted without the issuance of a Variance. <br /> SPECIAL PERMIT FINDINGS <br /> Upon review and consideration of the testimony and evidence entered into the record, the Zoning <br /> Board of Appeals hereby finds and determines that the existing minimum lot size, maximum lot <br /> coverage, and setback from wetlands are lawful pre-existing, nonconformities for the following <br /> reasons: <br /> • The lot contains 20,421 sq. ft. of land area and is wholly in the flood zone. Pursuant to <br /> footnote 16 in the Land Space Requirements Table, §174-31, where 40,000 sq. ft. is <br /> required. Thus,the lot is pre-existing, non-conforming as to lot size. <br /> • For zoning purposes, the existing lot structure coverage is 1,274 sq. ft. (100%), and the <br /> proposed is 3,138 sq. ft. (100%). <br /> • The existing structure meets the front yard setback, the rear yard setback, and both side <br /> yard setbacks. <br /> The Board further finds and determined that the proposed raze and rebuild proposal will not be <br /> substantially more detrimental to the neighborhood than the existing non-conforming structure and <br /> use for the following reasons: <br /> • The existing structure was built in 1996 and is not flood zone compliant. The new structure <br /> will be flood zone compliant. <br /> • The new structure will be built to current day building code standards. <br /> • The proposed structure was approved by the (DEP) Department of Environmental <br /> specifically stating that the project will result in an improvement over existing conditions <br /> noting the replacement of a non-flood zone compliant structure with a new flood zone <br /> compliant structure and substantial mitigation. <br /> • Drywells are proposed. <br /> 5 <br />