Laserfiche WebLink
Motion: I move that the Town vote to approve Article 29 as printed in the Warrant, with the <br />exception of the phrase "or take any other action relating thereto." <br />Motion passes unanimously at 8:56PM <br />Article 30 <br />To see if the Town will vote to extend for an additional three years the duration of the appropriation <br />approved under Article 20 voted at the May 2, 2022 Special Town Meeting, for Santuit Pond Resiliency <br />projects and stormwater improvements within the Santuit Pond watershed, and, further, to appropriate and <br />transfer the sum of $67,120 from revenue available for appropriation to fund a local match to the grant <br />received for said projects, or take any other action relating thereto. <br />Submitted by the Department of Natural Resources <br />Explanation: This article is necessary to continue efforts to address nutrient pollution and enhance reliance <br />in Santuit Pond. These funds would provide local match to leverage additional grant funding available <br />through the Massachusetts Municipal Vulnerability Preparedness Program (MVP) for the design and <br />construction of stormwater improvements within the Santuit Pond watershed. <br />Previously allocated funds have helped to bring in over $650,000 in grant funding to address stormwater <br />issues within the Santuit pond watershed. Phase 1 — Stormwater Assessment within the Santuit Pond <br />Watershed: $131,691.00 awarded, $19,050.00 local cash match. Phase 2 - Design and construction of one <br />high priority phosphorous loading location and concept design of Santuit Town Landing: $267,607.34 <br />awarded, $60,400.38 local cash match. Phase 3 — Design and permitting stormwater improvements at the <br />Santuit Town Landing, the abutting parcels (95, 105,111,117, and 125 Timberlane Drive), and roadway: <br />$228,000 awarded, $65,000 local cash match. 604/b grant award — Stormwater design and permitting at <br />one location within Santuit Town Landing parcel at 117 Timberlane Drive: $50,000 awarded, $16,000 local <br />cash match. <br />The remaining funds from Article 420 voted at the May 2, 2022 Special Town Meeting ($307,880) and the <br />additional requested funds ($67,120) will be used as a local match necessary to fund the final construction <br />phase of the project on the parcels identified in phase 3 of design and permitting. The final construction <br />costs are estimated to be $1.5 million, with a local cash match minimum of 25% ($1.125 million in grant <br />requests though MVP and $375,000 in local cash match). <br />The Select Board recommends approval of Article 30 by a vote of 4-0 <br />The Finance Committee recommends approval of Article 30 by a vote of 7-0 <br />Motion made by Select Board Member Cotton <br />Motion: I move that the Town vote to extend for an additional three years the duration of the <br />appropriation approved under Article 20 voted at the May 2, 2022 Special Town Meeting, for Santuit <br />Pond Resiliency projects and stormwater improvements within the Santuit Pond watershed. <br />Motion passes unanimously at 8:57PM <br />