Laserfiche WebLink
MEETING MINUTES <br /> MASHPEE ZONING BOARD OF APPEALS <br /> MAY 22, 2024 <br /> 37 Amy Brown Road: Owner, Bryan W. Anderson requests a Special Permit under §174-17.1, <br /> §174-17, and §174-33 of the Zoning Bylaws to raze a pre-existing, non-conforming single-family <br /> structure, and replace it with a new single-family residential structure, and a detached garage <br /> located in the R-3 Zoning District, Map 109, Parcel 4, Mashpee, MA. <br /> Attorney Christopher Kirrane requested a continuance until Wednesday, July 10, 2024 to allow <br /> time for the submittal of the architectural plans. <br /> Mr.Furbush made a motion to accept Attorney Kirrane's request for continuance until Wednesday, <br /> July 10, 2024. <br /> Ms. Sangeleer second. All were in favor to accept the continuance until Wednesday,July 10,2024. <br /> 104 Lakewood Drive: Petitioner, Mark Bannon requests a Special Permit under §174-17.1 and <br /> §174-33 of the Zoning Bylaws to raze a pre-existing,non-conforming single-family structure, and <br /> replace it with a new single-family structure and accessory stairway on property located in an R-3 <br /> Zoning District (Groundwater Protection Overlay District), Map 28, Parcel 164, Mashpee, MA. <br /> (Owners of record: John J. Marsters and Debra A. Marsters). <br /> Attorney Christopher Kirrane represents the Petitioner,Mark Bannon who purchased this property <br /> to raze and rebuild a single family dwelling. The hearing notice stated R-3, but it is actually in the <br /> R-5 Zoning District. This is a pre-existing, non-conforming structure as to the northerly side <br /> setback at 7.4 ft. the existing structure is also non-conforming as to the rear yard setback at 8.6 ft., <br /> and is non-conforming as to setback to wetlands. The site plan depicts an inland bank, and the <br /> structure is within 50 ft. of that inland bank. The structure is non-conforming in the R-5 District <br /> which requires 80,000 sq. ft. Removing or deducting the right-of-way, and deduct the wetlands, <br /> the lot size is 11,508 ft. The existing dwelling based on the lot coverage calculation is 7.5%. <br /> The existing house is a basically dilapidated. The new structure will be removed from the resource <br /> area off the inland bank, and will eliminate all the non-conformities. The side yard setback will <br /> become conforming, the rear yard setback will become conforming. The setback to wetlands will <br /> be non-conforming because of the stairway that benefits down the inland bank and not to disrupt <br /> the resource area. There is natural vegetative screening to provide stabilization to the bank. The <br /> proposed structure is larger, but the lot coverage will be 17.1% which is under the maximum <br /> allowed 20%in the R-5 Zoning District. The Conservation Commission has approved this project <br /> and is a better situation than what exists given the condition of the structure, and the location of <br /> the structure on the inland bank. The Board can find that this proposal will not be substantially <br /> more detrimental than what exists. This lot is under the Phase 2 Sewer and the Board of Health <br /> allows for the proper variance to put in the standard system until the new sewer project is <br /> completed. <br /> 14 <br />