Laserfiche WebLink
The motion passes unanimously. <br /> Documents provided: Cape & Islands Engineering, Inc. Notice of Intent application and <br /> project narrative 03/28/24 Plan "Site & Septic Design Plan" (no increase in flow) <br /> 6:42 <br /> N OI 43-3283 <br /> 135 Daniels Island Road, New Seabury Marina, LLC. Proposed marina expansion and <br /> improvement dredging. Rep: Tighe &Bond, Inc. (Cont. 4/18) <br /> AGENT COMMENTS <br /> The applicant has requested for a continuance to May 23, 2024 @ 6:36 pm. This is to <br /> allow more time for plan revisions based on discussion with Harbor Master and Conservation <br /> Agent. <br /> Motion made by Mr. Cook for a continuance to May 23, 2024 @ 6:36 pm. Motion <br /> seconded by Ms. Copeland.No further discussion. <br /> • Roll Call: Ms. Thombrugh (Yes), Mr. Cook(Yes), Ms. Godfrey (Yes), <br /> Ms. Copeland (Yes), Ms. Clapprood (Yes), Mr. Colombo (Yes). <br /> The motion passes unanimously. <br /> Documents provided: Tighe & Bond,Inc. Notice of Intent application and project narrative <br /> 03/21/24 Plan(s) "Preliminary Engineering" (7 sheets) <br /> 6:45 <br /> N OI 43-3269 <br /> 425 Monomoscoy Road, Mark H. & Lisa White. Proposed raze and replace of existing <br /> single family dwelling with a deck, boat house, driveway, title V septic system, landscaping, <br /> utilities & associated appurtenances. Rep: Cape &Islands Engineering, Inc. (Cont. 2115, 3121, <br /> 4118) <br /> [o II IYi II.ii III'a I kI➢II "u <br /> �de�ijatluou: 1,o lc tc, hoi-�JIC 11)g ',11 g,Aak'd v t'1]an (JS .,��:Vg.uuu::u� az, and aunzd <br /> Mr. Dibb, accompanied by Atty Franklin, confirms with the Commission that a letter has <br /> been submitted addressing their comments and summarizing the project's benefits. They outline <br /> the following revisions made to the plan: <br /> 1. He confirms the proposed vertical walls are engineered to meet current <br /> building and flood zone codes (Regulation 25). <br /> 2. Mr. Dibb clarifies that the revised plan reduces tree removal from five to <br /> two due to safety concerns; some trees are growing into the structure. <br /> 10 <br />