Laserfiche WebLink
3 <br /> Select Board <br /> Minutes <br /> July 15,2024 <br /> APPOINTMENTS AND HEARINGS <br /> j?qpqrqgeM pf.Publ-le-Works Director Q atherine Laurent: Discussion and <br /> Teml ora Sig Permit:Annual Hazardous Waste Collection: <br /> Waste................ - ­11,11,111,11-1.1­1 <br /> Department of Public Works Director Catherine Laurent requested approval of(8) signs; 3 square feet to be <br /> placed at various locations to announce the Annual Hazardous Products Collection on Saturday,August 17,2024 <br /> at the Mashpee Middle/High School. <br /> In accordance with Policy, signage would be installed one week prior to the collection and removed after the <br /> collection ends. <br /> Motion made by Selectman Weeden to approve the Temporary Sign Permit Application for the Annual <br /> Hazardous Waste Collection as presented. <br /> Motion seconded by Selectman Cotton. <br /> VOTE: 5-0. Unanimous. <br /> Roll Call Vote: <br /> Selectman Sherman,yes Selectman Weeden,yes Selectman Wyman-Colombo,yes <br /> Selectman Cotton,yes Selectman O'Hara, yes Opposed, none <br /> Award of Contracts: <br /> 1)psi Lij n1,,iiipe Services for Ma_� ee School HVAC.Projects Raymond Desl -Ass_ociate-s, Inc.: <br /> , <br /> It is the recommendation of the Selection Committee to award a contract for design/engineering services for the <br /> Mashpee School FIVAC projects to Raymond Design Associates, Inc. of Rockland, MA. The proposed contract <br /> fee of$120,000 with a non-to-exceed allowance of$17,000 for as needed additional service would fund the <br /> initial phase of the project which is the completion of an expanded feasibility study. <br /> The study will provide options for how improvement of air quality and the provision of air conditioning can be <br /> accomplished. This is the best approach to replace or supplement the HVAC at each school;the Middle-High <br /> School and the Quashnet School. <br /> Motion made by Selectman Cotton to award a contract to Raymond Design Associates,Inc. for <br /> Design/Engineering Services for the Mashpee School HVAC Projects as presented. <br /> Motion seconded by Selectman Wyman-Colombo. <br /> VOTE: 5-0. Unanimous. <br /> Roll Call Vote: <br /> Selectman Sherman,yes Selectman Weeden,yes Selectman Wyman-Colombo,yes <br /> Selectman Cotton,yes Selectman O'Hara,yes Opposed, none <br />