My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
07/24/2024 ZONING BOARD OF APPEALS Minutes
>
07/24/2024 ZONING BOARD OF APPEALS Minutes
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/15/2024 5:00:22 PM
Creation date
8/15/2024 2:46:41 PM
Metadata
Fields
Template:
Mashpee_Meeting Documents
Board
ZONING BOARD OF APPEALS
Meeting Document Type
Minutes
Meeting Date
07/24/2024
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
14
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
MEETING MINUTES <br /> MASHPEE ZONING BOARD OF APPEALS <br /> WEDNESDAY,JULY 24, 2024 <br /> The overall net increase of lot coverage by structures is approximately 396 sq. ft.,and the existing <br /> shed will be removed. The garage itself will be conforming to all the setbacks. This project was <br /> approved by the Conservation Commission with significant mitigation requirements. There are no <br /> new nonconformities being created. The only increase is the 50 ft. setback from wetlands,but this <br /> project will not create a situation that is substantially more detrimental to the neighborhood than <br /> what currently exists. <br /> Mr. Reidy read the Board of Health comments dated July 23, 2024 into the record; "House will <br /> remain 3 bedroom. In the main house there is one bedroom on the First Floor, one bedroom on <br /> the second floor and then the third bedroom will be moved to above the garage. Loft on 3'd floor <br /> cannot be considered a bedroom. " <br /> Mr. Reidy read the Conservation Department comments dated July 17, 2024; "Resource Areas: <br /> Buffer zone to BVW,, buffer zone to Salt Marsh, andLSCSF. NOIpermit application was approved <br /> with a vote of 5-1,for construction of attached garage, mitigation plantings, and planting of natives <br /> on town land. Garage area will be mitigated for by converting driveway sections into mitigation <br /> planting areas and planting native vegetation on abutting town land that will enhance the buffer <br /> zone to resource areas. " <br /> Attorney Kirrane stated that the bedroom count is currently three bedrooms, and it will remain <br /> three bedrooms. The project includes removing the bedroom from the main house, and adding a <br /> bedroom above the garage. <br /> Mr. David Delponte, homeowner stated that the loft exists outside of the main bedroom on the <br /> second floor of the house. <br /> There were no further questions from the Board or audience. <br /> Mr. Furbush made a motion to close the public hearing. Ms. Sangeleer second. All were in favor <br /> to close the public hearing. <br /> Mr. Reidy made a motion that the Board issue a Written Finding for 73 Whippoorwill Circle with <br /> the following conditions: <br /> 1. The Board has determined that the applicant meets all the conditions of a Written Finding <br /> under Mass General Law 40A Section 6. <br /> 2. Plot Plan — 73 Whippoorwill Circle, Mashpee, MA. Prepared for David Delponte and <br /> Karen Ciejek, Scale: 1" = 20', Date: May 23, 2024, Prepared by: BSS Design. Stamped <br /> and signed by: Thomas J. Bunker. <br /> 3. Building Plans—Prepared forDelponte Residence, 73 Whippoorwill Circle, Mashpee,MA. <br /> Issued: January 24, 2024, Scale: 1/4" = 1', A-1.0: Proposed Floor Plans, A-2.0: Proposed <br /> Elevations, A-3.0: Proposed Sections, FN 1-0: Proposed Elevations, FR-1.0: Proposed <br /> Floor Plans. Prepared by Krauss Architecture, West Falmouth, MA. <br /> 7 <br />
The URL can be used to link to this page
Your browser does not support the video tag.