My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
03/13/2024 ZONING BOARD OF APPEALS Minutes (2)
>
03/13/2024 ZONING BOARD OF APPEALS Minutes (2)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/22/2024 5:02:28 PM
Creation date
8/22/2024 10:05:27 AM
Metadata
Fields
Template:
Mashpee_Meeting Documents
Board
ZONING BOARD OF APPEALS
Meeting Document Type
Minutes
Meeting Date
03/13/2024
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
40
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
MASHPEE ZONING BOARD OF APPEALS <br /> DECISION FOR A SPECIAL PERMIT <br /> Owners, Robert P. McDonald, Jr. and Tracy A. McDonald <br /> 14 Capstan Circle, Map 111, Parcel 101 <br /> Mashpee, MA 02649 <br /> SP-2024-09 <br /> Attorney Kirrane believes that the Board could address this issue and request another dry well. He <br /> suggested that before a building permit is issued, the engineer could submit a letter of the <br /> calculations to satisfy the departments. <br /> Chairman Bonvie agreed that the engineer could submit a letter with certain storm calculations <br /> that is adequate for NOA standards,not DEP standards. Mr. Bonvie requested to have the engineer <br /> submit his calculations to David Morris, Building Commissioner, and the Board to review. <br /> Mr. Furbush asked how the owners will manage the drainage of the spa. Attorney Kirrane stated <br /> that the Board can condition that the water be drained off site. <br /> The Board reviewed the height of the dwelling on the building plans and agree that the Building <br /> Commissioner will review the plans when submitted for building codes, and zoning. Mr. Morris <br /> commented that the building plans are reviewed by the Board of Health at the time of the building <br /> permit is issued. <br /> Attorney Kirrane stated that the building plans are reviewed the by respective departments prior <br /> to issuance of a building permit. It is suggested that the Board can determine that the <br /> redevelopment will not result in a condition that is substantially more detrimental to the <br /> neighborhood than the existing structure, and that there is adequate land area to provide sufficient <br /> parking, and there are no new non-conformities being created. <br /> There were no more comments from the Board. <br /> SPECIAL PERMIT CRITERIA <br /> ARTICLE V -Nonconforming Buildings and Uses <br /> §174-17.1 Raze and Replace History:Added 10-15-2018 ATM,Article 16,approved by Attorney <br /> General 1-9-2019. <br /> No pre-existing, non-conforming single or two (2) family dwelling structures shall be torn down <br /> and rebuilt on any lot unless there is an issuance of a Special Permit from the Zoning Board of <br /> Appeals. Such a Special Permit may be granted only if the Zoning Board of Appeals finds that <br /> any changes, extensions, alterations or reconstruction of the pre-existing non-conformities are <br /> not substantially more detrimental than exists prior to removal of the existing structure and that <br /> there is adequate land area to provide sufficient parking. In no case shall new non-conformities <br /> be permitted without the issuance of a Variance. <br /> 3 <br />
The URL can be used to link to this page
Your browser does not support the video tag.