My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
03/13/2024 ZONING BOARD OF APPEALS Minutes (2)
>
03/13/2024 ZONING BOARD OF APPEALS Minutes (2)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/22/2024 5:02:28 PM
Creation date
8/22/2024 10:05:27 AM
Metadata
Fields
Template:
Mashpee_Meeting Documents
Board
ZONING BOARD OF APPEALS
Meeting Document Type
Minutes
Meeting Date
03/13/2024
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
40
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
MASHPEE ZONING BOARD OF APPEALS <br /> DECISION FOR A SPECIAL PERMIT <br /> Owners,Robert P. McDonald, Jr. and Tracy A. McDonald <br /> 14 Capstan Circle, Map 111, Parcel 101 <br /> Mashpee, MA 02649 <br /> SP-2024-09 <br /> 6. Conditioned that the applicant seek and obtain the Town Planner's review in reference to <br /> the Tree Bylaw Chapter 175 of the Town Bylaws prior to the application of a building <br /> permit. <br /> 7. The Board finds under§174-17.1 and §174-33 that the proposed project is not substantially <br /> more detrimental than the pre-existing,nonconforming structure or use to either the Town <br /> or the neighborhood,that there is sufficient parking,and there are no new non-conformities <br /> being created. <br /> S. Conditioned that the shed on the property will be removed. <br /> 9. Conditioned that the applicant submit prior to issuance of a building permit, the design <br /> calculations for the NDS Pro-Flow Well, and onsite drainage calculations to include the <br /> method he used whether DEP or NOA standards, and what event storm; i.e. 20-year, 50- <br /> year,or 100-year,and will include all the calculations,and he will certify that event hereto. <br /> The Board in conjunction with the Building Commissioner will review these standards, <br /> and if these standards do not meet the minimum standards of this Board's criteria, they <br /> may have to be upgraded. <br /> 10. The spa water to be removed environmentally. <br /> 5 <br />
The URL can be used to link to this page
Your browser does not support the video tag.