My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
09/08/2022 CONSERVATION COMMISSION Minutes
>
09/08/2022 CONSERVATION COMMISSION Minutes
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/12/2024 5:00:33 PM
Creation date
11/12/2024 9:01:36 AM
Metadata
Fields
Template:
Mashpee_Meeting Documents
Board
CONSERVATION COMMISSION
Meeting Document Type
Minutes
Meeting Date
09/08/2022
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
10
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
The Agent confirms that the application has been submitted to the Board of Health and is <br /> presently undergoing review. He emphasizes that there will be no expansion of living space; the <br /> purpose is solely for a septic system upgrade. The Agent suggests a negative determination. <br /> Motion made by Mr. Weeden for a negative determination. Motion seconded by Ms. <br /> Clapprood. No further discussion. <br /> • ROLL CALL: Mr. O'Neil (Yes), Mr. Weeden (Yes), Ms. Clapprood <br /> (Yes), Mr. Dalton (Yes), Mr. Colombo (Yes) <br /> The motion passes unanimously. <br /> Documents provided: 8/22/22 "Proposed Septic System Upgrade Plan." <br /> 6: 6 <br /> RDA <br /> 11 Ocean Bluff Dr. Proposed screen porch addition. Rep: Cape &Islands Engineering, <br /> Inc. <br /> Rd]C11l "11);nc k, cl(; lsta l bagll�< (JugUc, cc Isw] tPea4:l° , <br /> Mr. Lizardi-Rivera explains that the proposal involves converting an existing deck <br /> into an enclosed porch, measuring approximately 12 feet by 16 feet. He assures that there <br /> will be no increase in the number of structures, changes to wastewater flow, or alterations to <br /> utilities. The proposal includes the installation of a new foundation for the enclosed porch. <br /> Mr. Lizardi-Rivera notes that while the project is situated above the flood plain, the <br /> setbacks to the coastal bank are zero feet, including the retaining walls enclosing the deck. <br /> Additionally, he mentions that the pool is located 14 feet from the coastal bank, while the <br /> proposed enclosed porch will be positioned 20 feet away. Construction will be carried out <br /> manually. <br /> COMMISSIONERS COMMENTS <br /> Mr. Colombo confirms with Mr. Lizardi-Rivera that no materials will be kept on site <br /> during excavation, with assurance that everything will be transported to the front using <br /> wheelbarrows. <br /> PUBLIC COMMENTS <br /> There are no public comments. <br /> AGENT COMMENTS <br /> 5 <br />
The URL can be used to link to this page
Your browser does not support the video tag.