Laserfiche WebLink
1. 20 cubic yards of fill <br /> 2. No disturbance to existing vegetation <br /> 3. Mitigation plantings along the buffer zone by the saltmarsh <br /> 4. Average width: 40 ft from the edge of the mean high area <br /> COMMISSIONERS COMMENTS - None <br /> PUBLIC COMMENTS —None <br /> Abutters Letter <br /> • Kathryn&John Thorndike in support of the project <br /> • Adam Decter in support of the project <br /> AGENT COMMENTS <br /> • Benefit to the resource area through the creation of BVW <br /> • The proposed patio and addition area has been previously and legally <br /> altered <br /> • Mitigation of wetland buffer area proposed as a compensatory measure to <br /> offset the proposed patio and home addition <br /> • Agent recommends: Close and Issue with condition of submitting a signed <br /> 3-year mitigation monitoring contract between the property owner and a <br /> qualified professional. <br /> Motion made by Ms. Godfrey to close and issue with the condition of a signed 3-year <br /> mitigation monitoring contract between the property owner and a qualified professional. Motion <br /> seconded by Ms. Clapprood. No further discussion. <br /> o ROLL CALL: Ms. Thornbrugh (Yes), Ms. Clapprood (Yes), Ms. Godfrey (Yes), <br /> Mr. Colombo (Yes). <br /> The motion passes unanimously <br /> Documents provided: Falmouth Engineering, Inc. Notice of Intent application and <br /> narrative; July 08, 2024, Plan "Site Plan—Existing Conditions" (Sheet 1 of 2); July 08, <br /> 2024, Plan "Site Plan" (Sheet 2 of 2); July, 08, 2024, Plan "Landscape Plan" Yarmouth <br /> Port Design Group <br /> 6: 8 <br /> NOI 43-3302 <br /> 54 Kim Path, John J. and Christine S. Mizzi. Proposed raze and replace single family <br /> dwelling, installation of MircroFast System and mitigation plantings. Representative: BSS <br /> Design, Inc. <br /> Representative: Andrew Garulay <br /> 12 <br />