Laserfiche WebLink
• The proposed project involves the property line intersecting with the adjacent property <br /> owner's float. Has any discussion taken place regarding this matter? <br /> o No, there has been no discussion. <br /> o The Agent confirms that the abutters have been notified via Certified mail about <br /> the issue. <br /> PUBLIC COMMENTS <br /> There were no public comments. <br /> AGENT COMMENTS <br /> • The original proposal, along with current documentation and a letter from the Division of <br /> Marine Fisheries, confirms that 50% of the pier over the salt marsh will consist of <br /> composite grading. This design allows sunlight penetration. <br /> • The project complies with performance standards under Regulation 27. However, an <br /> assessment of impacts on shellfish remains pending. <br /> • Navigational concerns have been resolved in coordination with the Harbor Master. <br /> • The agent recommends a continuance to allow for the assessment of shellfish and <br /> the letter from the Division of Marine Fisheries has been reviewed. <br /> Motion made by Ms. Zollo for a continuance to October 131h 2022, at 6:03 pm. Motion <br /> Seconded by Mr. Dalton.No further discussion. <br /> o ROLL CALL: Ms. Zollo (Yes), Ms. Clapprood (Yes), Mr. Dalton (Yes), Mr. <br /> Colombo (Yes). <br /> The motion passes unanimously. <br /> Documents provided: Amended order of conditions 043-2619 and "Pier plan" 08/25/2022. <br /> 6:06 <br /> RDA <br /> 165 Whippoorwill Circle, Lloyd J. Stowell & Ronnie Stowell, Trustees Proposed <br /> construction of attached garage and driveway modifications. Representative: Holmes & McGrath <br /> ri�,.glle::i, l��6�So:, rcil.il /''trea i,n u�ua� '�O)Jecl u. it I1w,"I'age (�.rffloil, o,,�]) <br /> Representative: Mark Dibb <br /> • The proposed project involves adding a garage to the existing dwelling, complete with <br /> roof drains. Additionally, there will be a small expansion of the gravel driveway. The <br /> garage will be situated in an area that has been previously disturbed. Importantly, the <br /> entire project falls within the Land Subject to Coastal Storm Flowage. Furthermore, the <br /> project meets the performance standards under Regulation 25, with 35% of the lot <br /> remaining in its naturally vegetated state. <br /> 8 <br />