Laserfiche WebLink
<br /> <br />Minutes of Combined Meeting of <br />Mashpee Design Review Committee and <br />Mashpee Plan Review Committee <br />Held Tuesday, December 4, 2012 <br />Mashpee Town Hall Meeting Room 3 <br /> <br /> <br />Design Review Members Present: Walter Yarosh, Mary LeBlanc and Jonathan Furbush <br /> <br /> <br />Plan Review Members Present: <br /> Charlie Maintanis, Local Inspector <br />Tom Fudala, Town Planner <br /> Joel Clifford, Fire Inspector <br />Glen Harrington, Health Agent <br />Catherine Laurent, DPW Director <br />Scott Carline, Police Department <br />Joyce Mason, Town Manager <br /> <br />Charlie Maintanis called the meeting to order at 9:07 a.m. <br /> <br />401 Nathan Ellis Highway <br />Dino Mitrokostas <br />Return with additional information <br />Site Plan and exterior elevations_ <br /> <br />Steve Daley appeared and said Dino was not able to be present so he came for this meeting. Steve <br />Daley referred to the 11/6/12-1b set of Plans submitted as the new version of Plans. Walter Yarosh <br />stated that what was requested at the previous meeting were plans showing existing elevations of <br />current building with front elevation of the street side; and that is not on these plans. Also, picture <br />presented here is not accurate with what is there now. Steve Daley said this picture is just a <br />rendering. <br /> <br /> Walter said concept plans are great but in order to get building permits you have to submit <br />required Plans. <br /> Charlie Maintanis explained there may be some building code issues. This is not a true <br />rendering of what is going to be there. <br /> Charlie said if building goes over property line then not sure Building Department can issue a <br />permit. Tom Fudala said 2 properties are under Special Permit. <br /> Charlie noted that once you start putting in foundations, permanent structures, etc., now <br />looking at structure issues. <br /> Steve Daley said as he understands it from Dino the railing shown on this revised plan is <br />accurate and mounting of the structure is suppose to stay on decking and decking not suppose <br />to expand. The unit is modular in nature; not trying to expand deck; go by 11/6/12-1b Plan. <br /> Mary LeBlanc noted that we are missing an accurate site plan. Walter added that we don’t <br />have front elevation or existing and proposed site plans. <br /> Originally outdoor patio was permitted but if structure built that requires foundation, then <br />looking at a lot of other code issues. <br /> Steve Daley commented that currently a 2-3 foot flower box that has earth and stone is there <br />now. He said it is his understanding that they weren’t pouring footing but going into that flower <br />box. <br /> <br />