Laserfiche WebLink
�+ 'MINUTES January '14 , 1993 . . _ 2; BOARD OF HEALTH <br /> Acknowledged. , <br /> 6. ) Copy of letter from Town Counsel re: Cardillo case - <br /> Mr. , McQuaid informed Board members . he met with Mr. Cardillo <br /> ' who indicated he does not +intend to comply with this Board's <br /> request to upgrade his leaching facility to Title V require- <br /> ments. <br /> Mr. Greelish directed Mr. McQuaid to advise Town Counsel <br /> this Board would like the situation resolved as quickly as <br /> possible. <br /> 7 . ) Letter to Town Counsel re: Salzer case - Mr. McQuaid <br /> presented a copy of the letter forwarded to Town Counsel per <br /> the Board's request. <br /> Acknowledged. <br /> APPOINTMENT: Norman Grossman - "Willowbend" <br /> Mr. Norman Grossman, P.E. and Mr. Mark Pere were in at- <br /> tendance for this scheduled appointment. <br /> Mr. Grossman informed Board members he is present this <br /> evening to discuss the proposed model homes and to brief the <br /> Board on the progress of the treatment plant. <br /> Mr. McQuaid relayed, "New proposals for the <br /> "Willowbend" complex include a swimming pool, tennis court <br /> and a clubhouse. " <br /> Mr. Grossman stated, "Four model homes with holding <br /> tanks are proposed. " "There is an existing home, which will <br /> be converted into a sales office, that has a Title V system <br /> which will be utilized by sales personnel and perspective <br /> buyers. " "The proposal, which has been filed with the State, <br /> indicates the location of the proposed treatment plant. " <br /> "The leaching field will be placed beneath the driving <br /> range. " "The tennis court and pool complex will be con- <br /> structed in one of two proposed sites. " "We met with the , <br /> Planning Board for a preliminary discussion, no definitive <br /> plan was filed. " <br /> Mr. Pere stated, "We have received full conceptual ap- <br /> proval for the engineering report and the hydrological study <br /> for the treatment plant. " "Application and plans were admin- <br /> istratively complete and are in the process of completing the <br /> technical review. " "We did receive a draft permit. " <br /> I <br />