My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
02/16/1995 BOARD OF HEALTH Minutes
>
02/16/1995 BOARD OF HEALTH Minutes
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/28/2025 5:00:46 PM
Creation date
2/28/2025 2:48:53 PM
Metadata
Fields
Template:
Mashpee_Meeting Documents
Board
BOARD OF HEALTH
Meeting Document Type
Minutes
Meeting Date
02/16/1995
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
7
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
1` <br /> MINUTES February 16, 1995 3 BOARD OF HEALTH <br /> Mr. McQuaid commented, "It's hard to believe that it is a solid concrete pit if it's <br /> twenty-five years old." <br /> Mr. Ball stated, "Mr. DiMaggio has verified it is a leach pit." <br /> Mr. McQuaid stated, "I would recommend the Board consider allowing this on the <br /> condition the existing pit be hauled out, cleaned, and stone replaced around it." <br /> Mr. Ball stated, "I would recommend pumping the system." <br /> Mr. McQuaid relayed, "We don't know the depth to groundwater." "There are a <br /> lot of unanswered questions which is why we would normally require an engineered plan <br /> with a perc test done on site." <br /> Mr. Ball questioned Mr. Cain as to whether he intends to increase his habitable <br /> space?" <br /> Mr. Cain responded, "No." <br /> Mr. McQuaid stated, "If the Board is inclined to approve the request I would <br /> recommend a pert test to determine groundwater elevation." "Half of the pit may be in <br /> groundwater." <br /> Mr. Cain stated, "I am on a hill." <br /> Mr. McQuaid stated, "That observation could be done at the time of the <br /> installation of the tank." <br /> Mr. Cram stated, "I would vote to approve the request with the stipulation a perc <br /> test is performed and the owner agreed to sign the affidavit." <br /> Mr. Ball motioned to approve the installation of a 1500 gallon septic tank and <br /> distribution box at 8 Wilsons Grove with the stipulation, the existing leach pit is pumped, <br /> a perc test is performed to ensure there is 4' of permeable soil between the bottom of the <br /> leaching facility and groundwater and the owner sign the affidavit which agrees to no <br /> increase in habitable space, Mr. Cram seconded. <br /> APPOINTMENT: Down Cape Engineering - 22 Great River Road <br /> i. <br /> There was no representation in attendance. <br />
The URL can be used to link to this page
Your browser does not support the video tag.