Laserfiche WebLink
MINUTES November 30, 2000 3 BOARD OF HEALTH <br /> APPOINTMENT: Robert Fox re: Proposed addition at 128 Tide Run <br /> Architect Tim Luff was in attendance for this scheduled appointment. Mr. Fox was not <br /> in attendance. <br /> Mr. Luff indicated that the owner is requesting to add an exercise room and study. to <br /> the existing home. <br /> Ms. Warden stated that these rooms could be construed as bedrooms and the septic <br /> system was not designed to accommodate five bedrooms. <br /> Mr. Doherty stated that both new rooms can easily meet the standards of a bedroom <br /> and that they would easily be construed as bedrooms. Ms. Warden then <br /> recommended that the septic system be upgraded in order to accommodate these two <br /> additional rooms as bedrooms. <br /> Mr. John Slavinsky of Cape & Islands Engineering, who was in attendance for another <br /> matter and who designed the original system, stated that a bull run valve had been <br /> installed at the time of the system and that if it was replaced with a distribution box <br /> the system would be able to accommodate the additional bedrooms due to the system <br /> having flow diffusers. <br /> Mr. Doherty motioned to approve the plans pending activation of both the primary and <br /> secondary leaching and a distribution box in place of the bull run valve in order to <br /> accommodate a five-bedroom dwelling. Mr. Santos seconded the motion. Motion <br /> passed. <br /> APPOINTMENT: Ed Pesce re: 266_Monomoscoy Road <br /> Mr. Pesce was in attendance for this unscheduled appointment. <br /> Mr. Pesce wanted to update the Board on the project at 266 Monomoscoy Road. He <br /> indicated that the Conservation Commission voted to reconsider the project and that <br /> he would be scheduling a new dewatered perc test at the site within the next couple of <br /> weeks. <br /> 7. Emergency Repair Certification <br /> Ms. Warden indicated that the cesspool is full and that the installation of 1000- <br /> gallon pit with 3' of stone in the same location is necessary due to the fact that <br /> the lot is severely confined. Strip-out will be required. <br /> Board members forwarded their signatures to the Emergency Failure <br /> Certification form. <br /> 3 Attaguin Street <br /> Ms. Warden indicated that the cesspool was overflowing onto the ground <br /> surface and that the installation of a new pit with 3' of stone and a distribution <br /> box was necessary. Also, the lot constraints won't allow all galleys. <br /> Board members forwarded their signatures to the Emergency Failure <br /> Certification form. <br /> I <br />