Laserfiche WebLink
CONSERVATION COMMISSION x <br /> MRM-. NG OF JULY 11, 1991 4 <br /> Commissioners Present: Patrick Coffey, Barry Desrosiers, <br /> fa <br /> Sus aua Lannik Louise Behr anMASHPEE SELECTMEN'S <br /> . <br /> The Meeting was called to order OFFICE <br /> PROPOSM RBGUIICM - PUMC <br /> To be included within the submittal requirements -.A checklist of everything <br /> required and Cape Cod Commission checklist. <br /> Changes to be made: <br /> There was discussion of the legality of the requested 300 foot requirement with <br /> jurisdiction only 100 feet, Town Counsel to be consulted. <br /> Docks and piers. <br /> -RDA Fees -- Business, Comercial, or subdivision. Where was discussion of flat <br /> fee s square footage, The state charges $250. for Category 3. <br /> Vim: Notion made and seconded that the Notice of Intent fee be $200. and $100. <br /> for each increment; bequest for Determination of Applicability to be $10CL <br /> and $50. for each increment, <br /> #4: ; Motion rade and seconded to accept. <br /> #26, VOTE: Motion made and seconded to accept. <br /> c mi nis tra.tive Review: Mr. Sherman suggested the fee be dropped t $20.00. <br /> Vim: Motion made and seconded to reduce the fee for Administrative Review from <br /> $30.00 t $20.00. unanimous Vote, <br /> Ms Beh man left the meeting. <br /> 7:00 ROBOT J. KEIIY30 31 Birch way, Continued from ,lune 6, 1991 to allow applic- <br /> ation to Natural Heritage which was done. - Notice received it is bordering. <br /> VOM: Motion made and seconded to close the hearing. <br /> HEARING CLOSED <br /> 7:15 for the permitting of a repair of a structurally damaged <br /> foundation of an existing one story, wood frame, residence completed. under an <br /> Emergency Order of Conditions at 138 santuit Lane. Abutter receipts were <br /> presented. Herbert A.D ke and Bob McCloskey of Atlantic Design presenting. <br /> Under the Emergency order the foundation is in and certified. It is anticipated <br /> the house will be back dawn on Monday or Tuesday. <br /> A letter dated June 25 to Doug Boyd from Rich Tabaczynski was read into the record. <br /> Haybales are still there, shrubs, if they can be saved, will be put back in, or <br /> new ones planted if necessary. Construction will be complete within two weeks. <br /> The applicant agreed to waive the 21 days for the order of Conditions so the <br /> Agent can go out to the site and determine what should be done which could thea <br /> be included in an order of Conditions. A signed statement waiving the 21 days <br /> to be provided. <br /> TO BE CWSED A= INSPECTION Iff AGM AFM CALL FROM ALM BROW <br />