Laserfiche WebLink
i <br /> Mashpee gown Hall <br /> e te.mber 9,1981 <br /> Vires en Pauline F. DeLory, Chairperson <br /> Dorothy 'Studley, Vice hairperson <br /> Charles uo-Cinga <br /> Wayne Tavares <br /> Shirley ad e1man <br /> Albert A. Hollander <br /> Robert A. Braman <br /> Fred Fordham, Asst. Harbor i�`as t er <br /> (]hester Koblinskyo Harbor Haster <br /> Bruce Fulton <br /> i <br /> Theeeting was called to order at 7:40 p.m. The first nearing .is as follows <br /> Sweetie Realty `rust <br /> Eliot Convisor, Trustee <br /> Agent: Robert A. Braman <br /> Pauline: Reads Notice of Intent -- to construct a timber pier, ramp and float <br /> to grade terrace area and to construct steps to the pier at Lot 1194 oponesset <br /> lsla.rd Road, Mashpee, within loo feet of Poponesset Bay in accordance with plans <br /> on file. <br /> Mr. Braman: (Representing fir. onvisor•) As l think you know, fir. Convisor's lot <br /> Is located on Poponesset Island. There is an existing house there which he pur- <br /> chased some time ago. There are the remains of a portion of an existing dock <br /> (shown on the plan as an existing wood pier). It was built before the current <br /> Wetland's Act. It became effective possibly before any Wetland's Act. Regard- ' <br /> loss of when it was built, it does exist. 'khat we are proposing to do is utilize <br /> part of that pier and at the Poponesset Bay end of the pier, we would like to con- <br /> .struct a set of stairs to come down onto what would be a new pier at a lower ele- <br /> vation. The existing pier is 9.3 feet above mean low water, We would bring the <br /> new pier down t elevation . The proposed pier is 20 feet long. The eons�truc- <br /> tion is zoned by this typical bench section on the plan of 4 feet wide from center <br /> to center of the piles. At the end of the pier is a proposed ramp leading down to <br /> a float, The float is 16 x 20-which would be secured to two pilings (shown on the <br /> plan as solid circles). The float would be chained to those. The float and ramp <br /> would be taken out in the winter time and brought up onto the beach, In addition, <br /> Mr. Convisor intends to build an addition to the house. The addition is shorn on <br /> the plan but it Is not dimensioned,, As you can see, it is a fairy substantial <br /> ad ition. The portion heading westerly is a garage underneath, then family room <br /> and addi do .al living room ups to lrs. From that upstairs living room which would <br /> be facing the Bay, there will be a deck in the front and then a set ofstains <br /> leading do•rn to the terraced area and then the stairs (railroad ties with brick <br /> steps) coning down to join in to the end of the existing pier the westerly end), <br /> There is some planting proposed but is not shown on the plan, we propose that <br /> some plantings be placed along the banking gust to help to protect it, The bank <br /> is in pretty stable condition at the moment. There is some wild growth on i <br /> which would be supplemented b t�_i r plantings, The plan is based on mean-low <br /> water and the geodetic surreys in the area and established beach marks. The <br /> reason the pier is so long is so we could get out to a depth to moor small. boatso <br /> At low tide, there would be about a. foot and a half of water at the face of the <br /> float, The tide- range In P poness t Bair is given in the geodetic propagations as <br />