My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
7/29/1985 CONSERVATION COMMISSION Minutes
>
7/29/1985 CONSERVATION COMMISSION Minutes
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/16/2018 5:11:25 PM
Creation date
2/16/2018 2:37:59 PM
Metadata
Fields
Template:
Mashpee_Meeting Documents
Board
CONSERVATION COMMISSION
Meeting Document Type
Minutes
Meeting Date
07/29/1985
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
2
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
f <br /> MASHPEE CONSERVATION COMMISSION <br /> Meeting of July 29, 1985 <br /> Present at this meeting were:. <br /> ere:. Ia.rch . . Dardanot Chairman Pro Tem; <br /> Louise Behr an; Pauline eBo ; Elliot Rosenberg <br /> BarrySlone All Cape Survey Consultant, Inc. - Agent <br /> This application is to perform landscape improvements and extend <br /> existing deck and to connect to existing dock with elevated stairs <br /> at 292 Compass irc l e , New Seabury. <br /> Chris Costa, agent for the applicant, presented plans * He stated <br /> that there will be no excavating of the coastal bank,, He said the <br /> p l axe shows ars existing house and an existing dock and two proposed <br /> structures . It is proposed to extend the existing deck and from <br /> that deck construct a. walkw y which would connect to an existing <br /> dock. There will be some dist ~uance to the coastal bank in the <br /> area where the posts will be placed, No machinery will be used <br /> on the bank. The post-holes will be excavated by hand. Some- of <br /> the vegetation will be trimmed back but the root systems'- will' be <br /> left intact. Proposed pruning will be limited to enough to keep <br /> vegetation away from the deck and proposed walkway, <br /> Ir. Rosenberg expressed concern about the legality of the existing <br /> dock, Mr, Costa was unsure of the dimensions , etc. The dock was <br /> scaled and approximate dimensions we aye established. Ir. Costa <br /> was requested to provide the Commission with verification of the <br /> legality of the dock -before further action is taken, <br /> Marvin Glick All Cape Survey Consultants , Inc. - Agent <br /> This Petition was heard on May9, 1985 and is to construct and <br /> maintain a wooden dock and two floats over the tidal waters of Great <br /> Rivwe at Bot #62 Keel way, New Seabury, The following is excerpted <br /> from the minutes of that hearing:, <br /> " " s . Dardano stated that as an Enforcement order is being <br /> issued for work being done at this location by the Applicant, <br /> this hearing will be continued until such time as said Order <br /> has been complied with. 'f On motion duly made by Pauline <br /> I eLory and seconded by Stuart Peoples , and unanimously <br /> approved, this, hearing shall be so continued." <br />
The URL can be used to link to this page
Your browser does not support the video tag.