Laserfiche WebLink
14 :. C:0 MSt, RV A 10NJ X0MM I �.15; 10N <br /> M le b 1 7 <br /> Commissioners 'resent= V. Louise Behrman, Gertrude Ferriday, Carol <br /> Jacobson , _ -oseph Burns. <br /> Also present were Patrick Coffey, Associate Member and Lisa Hanscom, <br /> Conservation Agent. <br /> 00 - Andrea Langhauser of BSC Group representing Le be l-So l l o s came <br /> before the Commission to reque-st in -writing an amendment to the Order <br /> of Conditions for Beechwood Point pier which was approved under S - <br /> , if condition 19 were amended from driving the piles to getting <br /> the piles and the use of- 8 inch diameter piles instead of 12 inch was <br /> permitted, i.t has been verified by an outside contractor and L bel- <br /> Soll ws that by using a dolly they can bring the piles and the jet <br /> down the proposed gravel drive. , They can build off site a snarl float <br /> for, two men, put It .in the water in the 12 foot wide area arra jet <br /> piles in ' lace. Once construction begins the contractor will determine <br /> if it' is necessary 'to. cut .-the pile and to minimize the amount of <br /> jett.ing-, the construction---site within Santuit Pond will be delineated <br /> by a siltation curtain. The time of year for fisheries habitat could <br /> be conditioned. There will be no need for heavy machinery on the bank <br /> r additional cutting if getting is conditioned. <br /> Mrs. Ferriday asked if the walkway would be finished . Ms Langhauser <br /> s-fated the walkway has individual retaining steps which would be a' pro- <br /> blem and should be left as a ramp. <br /> Ms B hrm n stated the pathway should be clearly staked and access to <br /> the ramp and walk areas defined. Referring to a building outside the <br /> resource area, she questioned ghat was being done with the run-off. <br /> Andrea stated this was before her time. Ms B hrman stated , to prevent <br /> further erosion that will impact on the resource area, siltation <br /> screens should be installed. Andreas suggested a cover letter to <br /> include this suggestion and agreed to bring this to the attention of <br /> the applicant. <br /> i <br /> Mr . Coffey recommended dry mix be used in sono tubes for the walkway <br /> leading to the pier. <br /> 7: 30 Colonial Gas Co. (Coastal ngineering) To install a gas main <br /> along the South side of Old Barnstable Road within the road layout. <br /> Karen Blanchard of Coastal cnsineering and Bob Dowling of Colonia Gas <br /> presenting. his Blanchard stated the main will be installed on the <br /> North side and the siltation fence will be moved to the north side <br /> along the top of the bank . Work will be completed in one day . New <br /> plans have been seat to DEQE and a request for amendment will be <br /> provided in writing. <br /> Ms Behrman stated , for future reference , contours must be shown on the <br /> plans, <br /> Answering Lisa, Ms Blanchard stated sedimentation will be removed <br /> before the siltation screens are removed . This will be conditioned . <br />