Laserfiche WebLink
Conservation Commission <br /> November 17, 1987 <br /> Page 2. <br /> Ms Behrman stated a request for aendent in writing, two copies of <br /> plans and a telephone number - of meon responsible to contac should <br /> there be any concerns , prior to conditioning, <br /> CONTINUED PENDING RECEIPTOF -REQUESTED MATERIAL, TO BE CONSIDERED <br /> CLOSED UPON RECEIPT ORDER OF CONDITIONS IN 21 DAYS. <br /> - Ronald Carpe Wm. . arwi ck To construct and maintain an <br /> addition , deck and above around pool onto ars existing dwelling at Lot <br /> 65 Waterway. - Chris Clark and Fred Giampi tro, Architect presenting. <br /> Mr'. Giampietro stated most of the pool is above ground, but it is <br /> shallow, ' feet deep, 3 feet above ground to the surface of the deck <br /> .so i t wi 11 - be necessary to go in the ground at one end by two feet. <br /> M,s Behrman .stated this will require modification #of the Notice of <br /> Intent. <br /> Mr., Clark stated not shown on the plans presented tonight but on the <br /> plans submitted are a row of staked habales as a construction buffer <br /> and strick Limit of activity, 6 feet from the edge of the deck . Con- <br /> cerning the question of any existing order of conditions, it was <br /> stated there was none. <br /> Mr . Clark stated the lot is deep and the pool only 17 feet . Not shown <br /> on this plan but shown on the site plan is a d ywell to be constructed <br /> to take cane of roof drainage and in the event the pool does have to <br /> be emptied , it will go into the drywell . <br /> Mr . Burris questioned the filter and Mr. Gia Pietro stated the filter <br /> does not require backashing. Mr. Burns requested -that pool design <br /> information be provided. <br /> Mr. Clark seated they will submit a letter requesting to modify the <br /> Notice of Intent and wilLinclude the information on the non-backwash <br /> system. <br /> There was discussion of a tree with exposed roots. Ms Behrman stated <br /> it will be necessary to put in the Order of Conditions that existing <br /> debris be removed and the tree replaced. <br /> Mrs. Ferriday asked how the deck will be supported and Mr. Clark <br /> advised on Sono tubes. She requested they be located on the p,1lan . <br /> Mr. Coffey asked if they will bean the pool with the out.dig or haul it <br /> away. Mr . Gia rpietro stated they will haul it offsite and close in the <br /> bottom of the deck with lattice work. <br /> A comment from the Board of health was read ; No new .se tic plan <br /> received or approved . Title V system required . Mr. Clark statd he <br /> sent a letter dated November 6 , 1987. A pert test has been done , <br /> HEARING CONTINUED PENDING RECEIPT OF MODIFIED PLANS AND BOARD OF <br /> ALT I COMMENTS. TO CLOS D AT THAT TIME, I ' SAT l S ACT P . <br />