TOWN OF MASHPEE <br /> SENIOR CENTER BUILDING COMMITTEE <br /> Minutes of the Meeting of Wednesday, March 16, 2005 <br /> Committee Attendees: Also Attending: Absent: <br /> Irving Goldberg Jim Long, COA Director Betty Nichols <br /> Ed Adams Joyce Mason, Town Manager <br /> Art Weinstein Ernest Virgilio, Clerk of the Works <br /> Jean Noussee <br /> Harold Klegman <br /> Chairman Irving Goldberg called the meeting to order at 11:10 AM. <br /> REVIEW OF MINUTES <br /> The minutes from the Senior Center Building Committee meeting held on February 22, 2005, were unanimously <br /> approved by the committee. <br /> FUNDING STATUS <br /> 1. Joyce Mason distributed copies of a budget report, prepared by the Grant Manager, updating the status of <br /> the contingency fund. The fund is now down to$13,180. The$600,000 grant has been completely paid. <br /> 2. Iry Goldberg inquired about what would be done with the unused$45,000 in the budget for the septic <br /> system. Joyce stated that she expected it would be given back to the Town. Joyce is currently paying the <br /> Senior Center bills out of her account. <br /> 3. Jim Long reported receipt of a bill from Mr. Noonan, the electrician, for$1,380, which will be handed over to <br /> Joyce Mason for payment. <br /> 4. $9,700 is being held back from the contractor, until the landscaping is completed in the spring. The <br /> contractor is also committed to repairing all the disturbed areas around the perimeter of the Center and the <br /> parking lot, to a 4 inch finished grade. The contractor is not responsible for planting grass. <br /> REPORTS <br /> Punch List—Jim Long. Jim reported that many of items on the punch list were cleared up yesterday. The <br /> contractor adjusted a few of the doors and locks. The contractor explained that the water damage in a few <br /> places in the ceiling was due to the high winds accompanying our frequent winter storms. The carpeting man is <br /> due sometime this week to remove the bulges in the carpet that have developed in some places. <br /> John Catlin, Heidi Sokol and Bob Clark from JCA met with Jim Long at the Senior Center last week to review the <br /> punch list together. Some adjustments were made as to assignment of responsibility for the items that remain <br /> on the list. Still to be completed is the correction of the lighting in the arts and crafts room, as well as the <br /> reception desk area. The lighting in both these locations is inadequate. Since this is a design flaw, it becomes <br /> the responsibility of the architect to handle. Also to be handled by JCA is the replacement of disposal cans in <br /> the rest rooms, which are inadequate. The soap dispenser pumps in the rest rooms are not the right size and <br /> need to be replaced. The gutter is bent out of shape and will need to be repaired. As the snow continues to <br /> melt, leaks in the ceiling will appear, and will need to be fixed. The architect will need to be notified to repair the <br /> leaks as soon as they appear. <br /> PROJECTS <br /> Furniture—Jim Long. Jim reported that he is closing in on the list of additional items still needed. Remaining <br /> items include vinyl shelving and additional wastebaskets for the Center. Disks need to be installed on the <br /> bottoms of the chair legs in the multipurpose room, to allow them to slide more smoothly on the floor. Also still <br /> to be purchased is patio furniture and three or four tables for the back of the building, and four benches for <br /> placement in the front entry area. White cast aluminum is planned for the majority of the patio furniture. <br /> Umbrellas for the patio tables are being considered. The drawback to umbrellas is their nuisance factor: putting <br /> 1 <br />