Laserfiche WebLink
BOCA PLAN REVIEW SERVICES <br /> ELECTRICAL PLAN REVIEW REQUIREMENTS <br /> In order to perform a thorough Electrical Plan Review, the following specifications, <br /> drawings and details should be submitted: <br /> 1. Complete plans and specifications of all electrical work. <br /> 2. Labeling criteria of all electrical equipment. <br /> 3. Lighting floor plan including electrical circuits indicating conduit and wiring sizes. <br /> 4. Power floor plans including electrical circuits indicating conduit and wiring sizes, <br /> equipment and disconnect switches. <br /> 5. Exit sign/means of egress lighting location and power supply. <br /> 6. Panelboard schedule. <br /> 7. Lighting fixture schedule. <br /> 8. Symbol schedule and diagrams. <br /> • 9. Specifications to include requirements for: <br /> a. Raceway and conduit with fittings. <br /> b. Wire and cable. <br /> c. Electrical boxes, fittings and installation. <br /> d. Electrical connections. <br /> e. Electrical wiring devices. <br /> f. Circuit and motor disconnects. <br /> g. Hangers and supporting devices. <br /> h. Electrical identification. <br /> i. Service entrance and details. <br /> j. Overcurrent protection. <br /> k. Switchboards. <br /> I. Grounding. <br /> m. Transformers. <br /> n. Panelboards. <br /> o. Motor control centers. <br /> p. Lighting fixtures. <br /> q. Fire protective signaling systems. <br /> r. Automatic fire detection systems. <br /> s. Emergency/standby systems. <br /> • <br />