Laserfiche WebLink
• BOCA PLAN REVIEW SERVICES <br /> SPRINKLER PLAN REVIEW REQUIREMENTS <br /> In order to perform a thorough Sprinkler Plan Review, the following items should be <br /> submitted: <br /> 1. Complete plans and specifications for the sprinkler system and related equip- <br /> ment. <br /> 2. Description and locations of uses within the building. <br /> 3. Design details in accordance with the appropriate reference standard(i.e. NFiPA <br /> 13, 13D, 138) as referenced by the BOCA National Building Code. <br /> 4. Design calculations indicating the discharge requirements of the system with <br /> evaluation of the arrangement and source of the water supply. <br /> 5. Results of a current flow test indicating the location and date of the test. <br /> 6. Working drawings indicating all pipe sizes and the spacing between branch lines <br /> and sprinklers on the branch line. <br /> • 7. Material specifications and equipment specifications. All materials used should <br /> be verified that they are installed in accordance with their listing. <br /> • <br />