Jan explained he concentrated on the setback from 151 , to create a retreat <br /> like setting . On this revised plan , he used a 400 foot set back from the <br /> layout line . <br /> He tried to provide parking for the fields in back of the school . That <br /> could be continued to possibly provide emergency access through the site. <br /> Bob Fournier explained he met with the building inspector and Fire <br /> Department. The Fire Dept would like to see the second egress from Old <br /> Barnstable Rd, not 151 . They want a minor clearing off of 151 in case a <br /> vehicle needs to get through . <br /> They would like to avoid 151 egress , it is a high traffic road , kids will <br /> try to turnoff there. They don ' t want a gaited access there either. <br /> Bill Martiros thought the tennis was going to be near the road , so police <br /> can supervise after hours . <br /> The tennis could be swapped with the practice field so it would be closer <br /> to the road . Paul and Steve like it where it is . <br /> Another important move was to get some parking closer to the main entrance . <br /> Peter added that it is important that senior citizens can get dropped off <br /> at the door . <br /> Merry Sue is concerned the big usage areas are the gym and auditorium and <br /> the parking is skewed towards the other end of the building . People will <br /> not park in the far lots . <br /> ?eter said the goal should be to minimize the cost of land acquisition . <br /> We want to preserve the continuity of the top part of the parcel to have <br /> access to the river . <br /> Tom noticed there are a lot fewer ballfields than on the original list. <br /> Merry Sue explained this is the minimum amount of fields to run the <br /> program. What he is referring to was the wish list. <br /> We will need additional land for future fields . <br /> Tom asked when we should begin talking to the housing authority about the <br /> possibility of adjusting their boundaries? <br /> Steve asked if they are exempt from eminent domain taking? <br /> Tom does not know how it would work . <br /> PROJECT MANAGER REPORT <br /> Brian Rowlands was present representing Chartwell . He reviewed project <br /> status report No. 5 with the Committee. <br /> Contracts : both are almost ready for signature . <br /> Program: waiting for the net to gross calculation . <br /> Site Development: land survey should be complete within 1 week. Wetlands <br /> have been flagged. There is a greater length of wetland edge than expected . <br /> They will walk it with Bob Sherman , the delineation requires his approval . <br /> Schedule : Ian thinks the value management session may have to be delayed 1 <br /> week . Brian explained they need as much information going into it in order <br /> to make good decision . <br /> Bob Fournier will update the schedule accordingly . <br /> Ian would also like to see a cost comparison of concept "A" . <br /> 2 <br />