My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
1994 JAN-JUN-HIGH SCHOOL BUILDING COMMITTEE
TownOfMashpee
>
Town Clerk
>
Minutes
>
SCHOOL COMMITTEE
>
HIGH SCHOOL BUILDING
>
1990-1999
>
1994
>
1994 JAN-JUN-HIGH SCHOOL BUILDING COMMITTEE
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/1/2016 7:15:16 PM
Creation date
11/17/2016 3:30:51 PM
Metadata
Fields
Template:
Mashpee_Meeting Documents
Board
SCHOOL
Meeting Document Type
Minutes
Meeting Date
06/30/1994
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
177
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
classrooms. <br /> - New intermural gym. 45 , 00 sq feet. They wanted it designed <br /> and built in 6 months. It was a design/build effort. They met <br /> the schedule and came in on budget. It is a metal frame building <br /> with sports surface floor. 6 basketball courts and indoor <br /> running track. <br /> - IBM facility in Southbury, Conn. Mr. Freeman explained the <br /> history of the project. They did the feasibility study for a <br /> 225 ,000 acre site. They did not want to see the building from <br /> the main street. Strict wetland laws . There was 750,000 sq feet <br /> of offices, 600 seat dining facility, 120,000 sq feet of computer <br /> rooms and 65% of the offices had to have windows . They designed <br /> it as a campus type community with a series of smaller facilities <br /> ( buildings) . They stared construction in mid 1986 and it opened <br /> in Jan. 1989, 6 months ahead of schedule. They cleared 110 acres <br /> of woodland, created a pond for the water run off. Since then, <br /> IBM has cut back on its use of the building and are leasing some <br /> of the buildings. The Director of Real estate for IBM has since <br /> left IBM and hired BTA to renovate the Prudential Center. <br /> Mr. Ricci said their vision of Mashpee high school is to create <br /> your vision . They wanted to show some of the work of BTA and <br /> Holmes and Edward to show how they respond to the clients needs. <br /> They. make buildings which endure, they do not become stylized. <br /> They presented a list of consultants they propose working with. <br /> They have worked with all those people before. <br /> They had one question for the Committee - who will tell us what <br /> the community wants? <br /> QUESTIONS <br /> Bill Martiros- what influences are of concern to you, regarding <br /> the site i .e. relationship to Mashpee Commons, performing arts <br /> center? <br /> BTA responded they will start with a series of diagrams for the <br /> master plan. Where the entrance is will influence the site <br /> greatly. The town planner has probably looked at the influences <br /> along the "spine" ( 151 ) of town. They will see what planning has <br /> been done. The building will reflect the town's aspirations , as <br /> it develops. The Committee will articulate to us and it will grow <br /> out of your land. Architecture is of place and material . <br /> Bill asked if there is an advantage to using a mixture of <br /> materials on the outside? <br /> There is an advantage because it will break it up, bring it into <br /> scale. The ability of the material to be maintained is the major <br /> consideration . <br /> Paul Griffin said he saw some very creative work but did not see <br /> a lot of school projects , have you done many high schools? <br /> BTA responded they have not. Bennington High was completed in <br /> 1970, Andover Academy they did science, arts and dormitory <br /> facilities. They do have past high school experience and the <br /> 3 <br />
The URL can be used to link to this page
Your browser does not support the video tag.