Schedule- has slipped by a week or 2 . Can probably be picked up in the <br /> design development phase. <br /> Budget- Ian has analyzed the cost model form Daedulus and had several <br /> differences . They were not available the last few day but he hopes to <br /> resolve the difference by next meeting . They were not working with the <br /> same information as Chartwell . <br /> He is concerned about the projected site costs . <br /> Paul explained the total project cost is $110 per sq foot - that includes <br /> everything , building , fields , sewage treatment plant. Therefore it is not <br /> just a site problem ( cost) , it is an overall project problem. It does not <br /> matter how you slice the pie - total is $20 , 200 , 000. Paul has budgeted <br /> $1 . 8 million for the site ; the sewage treatment plant was in the building <br /> costs. If we can get the State to exclude the STP from the formula, that <br /> savings can be passed onto the project. Bob Cramer thought he could make a <br /> case to the State. <br /> Ray asked , since the STP is included with the building budget, does that <br /> mean the building sq footage should be 181 , 000 with 2 , 000 for the STP? <br /> Paul said it depends on how the State will calculate the money . Will they <br /> give us 183 , 000 plus 2 , 000 for the STP? We need to know where we stand <br /> with them. <br /> Ed said we will need to make a decision on the plans before we have an <br /> answer from the State . We could get 2 ,000 sq feet out of the building if <br /> we had to. If the State does not exclude the STP, either the budget goes <br /> up, or some space comes out. <br /> Subconsultants- Chartwell is waiting for approval from the Town for Tams <br /> and Beacon . The STP review RFP is going out to 3 consultants . Bob <br /> Whritenour explained he wanted all the design and project manager <br /> subconsultants to go to the Selectmen for final approval , since they are <br /> the awarding authority . <br /> Paul explained that Ian needs approval for these now. The subcommittee had <br /> the approval authority and they gave it to him. He now needs a letter from <br /> the town . <br /> Bob Whritenour said he will move forward with approval for Chartwell <br /> subconsultants now. <br /> MEETING WITH PERFORMING ARTS CENTER GROUP <br /> Mr. T . K . Thompson and John Prockos from Graham Gund architects were <br /> present. They presented a video about the performing arts center. <br /> Bill Martiros said originally he heard this project would be 10 acres. Now <br /> he hears 35 acres . The site study traffic study reported there will be <br /> 19 , 500 cars per day on Rte 151 . He asked Mr . Thompson is they have <br /> projected the number of people attending their performances? <br /> Mr . Thompson explained they have a 10 year business plan , with a specific <br /> number of concerts . 1st year will be 65 performances, 10th year there will <br /> be 75 performances . They tried to plan conservatively . Total number of <br /> attendants in the first year will be 25 , 000 people . When he mentions a <br /> setting like Tanglewood , he means the environmental setting , not the scale . <br /> Peter asked how much developable land they were originally given? <br /> Mr. Thompson said a total of 35 acres but with the setback form the river <br /> about 20 developable acres . <br /> 3 <br />