My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
1994 JUL-DEC-HIGH SCHOOL BUILDING COMMITTEE
TownOfMashpee
>
Town Clerk
>
Minutes
>
SCHOOL COMMITTEE
>
HIGH SCHOOL BUILDING
>
1990-1999
>
1994
>
1994 JUL-DEC-HIGH SCHOOL BUILDING COMMITTEE
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/1/2016 7:15:21 PM
Creation date
11/17/2016 3:30:54 PM
Metadata
Fields
Template:
Mashpee_Meeting Documents
Board
SCHOOL
Meeting Document Type
Minutes
Meeting Date
12/31/1994
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
182
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Mike requested minutes of the Building Committee meetings. <br /> Paul suggested Mike coordinate all meetings with the subconsultants through <br /> Chartwell . <br /> Mike added that he has a vast resource of contacts in the telecommunication <br /> industry. <br /> Bill said some school systems are looking at not having a library in their <br /> school . Maybe this library is obsolete. <br /> Paul said people are not yet ready to give up books. <br /> Steve said maybe the number of books we need in the library gets adjusted <br /> but not eliminated. <br /> (Steve Greelish left the meeting. ) <br /> Joe Polito had to leave the meeting and requested the Committee review the <br /> plans so he can share his comments. <br /> - How will the sidewalks work on Old Barnstable Road? <br /> - Sign for the school , will it get better exposure in front of the school <br /> or at the intersection? <br /> The Committee agreed two signs will be needed - 1 cheap, 1 good. <br /> - There are a lot of toilets all over the place. Can some of the faculty <br /> ones become unisex, eliminating some? They cost about $8,000 per room. <br /> - Tip of the arrow. Give thought to eliminating it, there is a lot of money <br /> in it. Paul said the floor plate of the building has been set. <br /> - Roof drainage , has to be looked at very seriously for ponding. <br /> (First floor administration does not reflect changes that have been made. ) <br /> The classroom door issue has not been resolved. Bob told Daedalus there <br /> will be 20 more doors than presently shown on the plan . <br /> - Cafeteria - circulation in front of the auditorium, is there a problem <br /> with it? <br /> Bob has asked Perkins and Will to address that issue with diagrams and a <br /> letter. Joe said it will become a real sore point; it has to be corrected. <br /> - Glass vs. brick, wood vs. brick and the cost factors . Where can we save <br /> money? It has to be looked at. <br /> Paul said that is a done issue, Committee agreed on it. <br /> Joe said if we' re looking for ways to cut, it can be looked at. <br /> Joe said the comment sheets show many people are not happy with the looks <br /> of the building. <br /> - Is there enough operable sash to get fresh air in? <br /> Paul said the window will let some fresh air in but the ventilation is from <br /> overhead system. <br /> Joe asked how much it would cost for larger windows. <br /> Paul asked about the bike rack location. Would be cheaper to put them all <br /> together? The ones near the play fields are not close enough to be useful . <br /> - Joe said the Committee has to look at carpet! <br /> Merry Sue asked the custodian in her building who said he can clean carpet <br /> cheaper than tile floor. <br /> Paul said we have to buy the right equipment to clean it. <br /> - Paul said timber benches are shown. There are more durable materials. <br /> - Courtyard shows 6 ft wide concrete walkway, concrete is too expensive. <br /> Bob suggested stone as a good alternative. <br /> C <br /> �, �7 <br />
The URL can be used to link to this page
Your browser does not support the video tag.