Laserfiche WebLink
21 . Change gallery wall to GWB from brick. Ray disagrees. <br /> 21a Ed does not recommend this change. Ray does not recommend it either, <br /> don 't close in the classrooms. These windows are an important aspect of the <br /> design. <br /> 20. Ray will review this . <br /> 19 . The Committee does not agree with this recommendation. <br /> 18. Skylight - Ed said they will try to find a way to do this. <br /> 17 . Ray said he will try to reduce the clerestory window but keep light <br /> coming in. <br /> 16 . Ray said GWB is more desirable. Hold. <br /> 15 . Ed said he would accept this recommendation. Ray agreed . <br /> The Committee agreed. <br /> 2 ,4 and 12 = $100,000 , can SMMA save $40 , 000 on those 3 items. They said <br /> they can. <br /> Ed said they are trying to save as much light coming into the building as <br /> possible, and surfaces where they can pick color and pattern . <br /> 27/28. The Committee agreed to delete them. <br /> 26- Duel Fuel . Bill said there is an incredible amount of savings <br /> associated with this - $50 ,000 per year, every year. Paul said he agreed <br /> but the Committee has no choice, they have to cut it. <br /> Mechanical/Electrical engineer suggested buying the boilers for duel fuel <br /> and the tank/containment can be added later. That way you still have the <br /> capability. <br /> ** Joe made a motion to put in the boilers for duel fuel but not the <br /> tank or lines. Merry Sue seconded the motion. 4 in favor, 1 <br /> against. <br /> 6 . Reduce gym bleachers to 800. <br /> ** Joe made a motion to reduce gym bleachers down to 800. Janice <br /> seconded the motion. 3 in favor, 1 against. <br /> Paul said we must meet $21 . 1 million ( including $500 ,000 value added, <br /> $500, 000 contingency) Now it is $800, 000 off. <br /> There are some areas which need more review. <br /> Any more ideas to get down another $800,000? <br /> Last week the Committee removed the janitors bathroom. Teachers bathrooms <br /> will all stay in. <br /> Shorten hot water return. Paul suggested only 2 not 4 boilers are needs. <br /> Paul suggested using an alternative to brick, less expensive masonry <br /> product for the rear (east side) of the building. <br /> Ed said they could do the whole building in a decorative block. He would <br /> like the Committee to look at that. It would be substantially cheaper than <br /> brick. <br /> Bob suggested they could reduce the cost of the STP from $800 , 000 to <br /> $700, 000 . Everyone agreed. <br /> - Everyone agreed to assume they could reduce the thickness of the paving. <br /> - Irrigation system: <br /> ** Merry Sue made a motion to delete the irrigation system for a <br /> savings of $77 , 000 . Joe seconded the motion. All members were <br /> in favor. <br /> Paul said there is $800 , 000 of cost associated with the brick . Can SMMA <br /> 11 <br />