Laserfiche WebLink
one wing. The decision to rent space is premature. <br /> Dr. DeMoura does not have a problem with that. The problem is he can 't make <br /> 3 offices into 1 . Also, he doesn 't want to have to move his office every <br /> year. <br /> Paul said in another 60-90 days, they will have the construction documents <br /> plans and will review it to see what can be done to house the <br /> Superintendent. Whether it is worthwhile to move into the high school for <br /> a few years is up to him. <br /> Dr. Demoura said the Board of Selectmen want him to move within this fiscal <br /> year. <br /> Peter said it was not an official vote of the Board. Bob Whritenour is <br /> looking at the building in total to determine the most efficient use of <br /> space. <br /> Bill Martiros suggested having one common area for storage for all 3 <br /> schools, since they are close together. <br /> Paul said the equipment would have to be put on a trailer to move it. <br /> Dr. DeMoura said presently, they only have a riding lawnmower, all the <br /> other equipment has to be purchased. <br /> Bill Hauck said if the storage is attached to the treatment plant it may <br /> require it to be sprinklered. Anything over 7 , 500 sq feet would have to be <br /> sprinklered. It is something to keep in mind . <br /> MEETING WITH FURNITURE CONSULTANT - MANNY TAVARES <br /> Mr. Tavares was present to give an overview of what goes into the furniture <br /> consulting job. He is an independent, professional consultant, with no <br /> affiliation to any manufacturer. <br /> There are 3 major groupings: <br /> a. That in the general contract - physically attached to the building. <br /> B. Furniture items - occupies floor space but it not attached . There are 6- <br /> 7 major categories. <br /> C. Group 3 Miscellaneous - there are about 20 bidding categories including <br /> the science apparatus, miscellaneous teaching aids, hand tools, etc. <br /> He will develop a room list for each space in the building. <br /> To reach a determination of needs for each department, there needs to be <br /> specific input form the Committee and Department Heads. Every school is <br /> different. From that information he develops a bidding document. <br /> The Bidding is done in 3 different phases: <br /> - furniture at one time <br /> - remaining group 3 are dividing into 2 separate packages because of the <br /> amount of items. <br /> Bid documents include specifications for each category of equipment, <br /> including a description of each item. He usually includes a make and model <br /> for reference - to show a minimum standard of quality for that item. <br /> There are 3 distinct levels of quality. <br /> In New England, there are 5-6 companies that bid on a project like this. <br /> The bid packages are advertised locally, through the Sec. of State office <br /> and usually distributed from Tavares office. He asks for any local vendors <br /> that may be interested and gets the documents to them. He attends the bid <br /> opening, assists in anyway the Committee wants him to. One copy of the <br /> 2 <br />