Ian said some are very simple , he will answer as much as he can and bring <br /> the remaining questions to the Committee . <br /> 2 . SubConsultants : they have not reviewed anything in writing stating the <br /> town has approved the subconsultants . <br /> 3 . Site development : the gee technical work is completed . The report will <br /> be completed in about 1 month . The architectural survey is about to get <br /> under way . They may need another approval from Brynwood , their original <br /> approval deadline was Sept . 3rd . <br /> 4 . Ian and Tom Wren had a meeting with Joe and Paul to develop a list of <br /> outstanding life cycle cost issues . <br /> Paul told the Committee he has an appointment with furniture consultant <br /> Tavares next Thursday , Sept 22nd and will have some answers after that . <br /> The figures suggest an overrun of $1 . 25 million . Some proposals were held <br /> in abeyance . The report outlines areas of "decision required" . The <br /> Committee reviewed the report.. (.all figures are net . ) <br /> 6 . 7 acoustical ceiling tiles in classrooms : 2 x 2 are more expensive . Lire <br /> cycle costs is a wash , if they sag it is aesthetic decision to replace . <br /> Paul said air conditioning/humidity will have an effect on this . He <br /> suggested tabling the discussion until those decision are made . <br /> Bob said they have neen investigating ceiling tiles With manufacturers that, <br /> won ' t sag . The new products come in, both si _es . <br /> Merry Sue asked which are easier to remove for maintenance? <br /> Bob explained the bottom of all mechanical units will be flush with the <br /> ceiling for easy access . <br /> Greg said a 2 x 2 makes a small room seem more spacious . <br /> 6 . 3 quarry . t he instead of bluestone . <br /> Ed said they would prefer bluestone . - <br /> Bill they Were going to Walz on a de--ision to get a continuity of <br /> design , with other ma.terlals . <br /> Ian said they need a basic spec agreed to for the next estimate ir, 2-3 <br /> weeks . <br /> Ed said these a, e relatively small cost items . The Committee could go <br /> through the list arid make a recommendation so they have that to work with . <br /> Ed understands if they can save money save it. <br /> Peter waists to be sure the lobby is dressed up . <br /> 6 . 11 The Committee agreed not to do it, they don ' t want to spend the money . <br /> 6 . 12 GWB%metal stud instead of CMU between classrooms and above walls with <br /> lockers . The Committee agreed . <br /> 6 . 14 Ground face block in corridors . Ed strongly recommends against it, it <br /> is dark and will need more lighting and is hard to clean . <br /> Steve asked about the third alterative of epoxy paint on block . <br /> This needs further investigation . <br /> .k Paul made a motion the architects use some form of a masonry <br /> product in the high traffic areas that is not ground face block , <br /> something with easy maintenance . Merry Sue seconded the motion . 6 <br /> embers were in favor , Bill was against . <br /> 7 . 1 Rtiiception des ' _ Committ agr-ed -SiAMA.. should design something less . <br /> 8a . 1 Chartwell was unsure of the request. <br /> 8a. 2b Emergency generator . Chartwell analysis suggests it is better to <br />