Laserfiche WebLink
is it worth it? <br /> Steve said to run the plant under capacity costs more . At 15 , 000 gallons <br /> it will run more efficiently . <br /> Ian asked about the time frame for getting a variance? <br /> Steve feels the DEP will give a commitment on the size of the plant within <br /> 3 months . <br /> Steve said at the meeting with DEP, they said the Town ' s engineering <br /> representative told DEP the town would be going for a 25 , 000 gallon plant. <br /> Peter asked the Committee if they want to stay with the present consultants <br /> or ask SMMA to change consultants? <br /> Bob Fournier said they have thought about it and suggest keeping them on . <br /> SMMA and the Town have invested a lot in them, they have done the <br /> calculations, have done the field investigation and the sella investigation <br /> and are ready to take the next step for whatever size plant the Committee <br /> directs . Mark Pare has said he will 'build whatever size plan- the <br /> Committee wants and will support it before the DEP based or the information <br /> the Committee generates . <br /> Steve said they are a good engineering team bur he was s': `prised at the <br /> comments from DEP . He is concerned they are delivering =, different <br /> messages . <br /> Paul suggested they come to the next meeting and let there convince the <br /> Committee they should be part of the team, Presently 'we ar-e getting mixed <br /> signals . This way they will be on record . If SMMA wants to get a black eye <br /> over a consultant, then they have to deal with that. This could be a big <br /> flaw in a beautiful school . the Committee needs to be -on`.'i nced he Vii i l <br /> wort( on our behalf . <br /> Bill , Merry Sue and Joan agreed they should speak to the Committee and <br /> address the concerns . Steve agreed they deserve a chance . <br /> Peter said he does not have 1000,6 confidence that Mark Pare ' s con,:ersations <br /> with DEP are in the town ' s best interest . <br /> Ed Frenette recommended the Committee listen to them. He asked if however , <br /> things are so sour now that now matter how well they perform it can ' t be <br /> resolved? <br /> Peter said the Committee will listen to them; they are not ready to make a <br /> decision . <br /> ** Paul made a motion to ask the engineering firm of DeFao wait and <br /> Pare to design a 15 , 000 gallon per day sewage treatment plant but <br /> the building be sized to house the larger facility . Merry Sue <br /> seconded the motion . All members in favor . ** <br /> Steve would like them to discuss with the Committee the treaument train <br /> alternatives and there capital costs vs . operating costs . Bob Fournier <br /> will ask him to be prepared to discuss that. <br /> PROJECT MANAGER REPORT <br /> �ont:u.-tS . Lney recci ''✓!J o•, - jnforlia icn f0� - c ntr"aC- d0;;:.'"�:=f•.t.8 <br /> from Town CounSei but there is some information Town Counsel .suggested be <br /> best answered by the Committee . <br />